Difference between revisions of "PITMinutes 08-13-2018"

From CASA Wiki
Jump to: navigation, search
(Attendance)
Line 1: Line 1:
 
== Attendance ==
 
== Attendance ==
  
R. Bachimanchi, K. Baggett, M. Drury, A. Freyberger, R. Geng, C. Hovater, G. Krafft, A. Kimber, R. Legg, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, T. Reilly, A. Seryi, and A. Solopova.
+
R. Bachimanchi, K. Baggett, M. Drury, A. Freyberger, R. Geng, C. Hovater, A. Hutton, G. Krafft, A. Kimber, R. Legg, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, T. Reilly, A. Seryi, and A. Solopova.
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==

Revision as of 13:26, 13 August 2018

Attendance

R. Bachimanchi, K. Baggett, M. Drury, A. Freyberger, R. Geng, C. Hovater, A. Hutton, G. Krafft, A. Kimber, R. Legg, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, T. Reilly, A. Seryi, and A. Solopova.

Agenda and Notes

1. Operations Status and Summary/Review (Freyberger)

During SAD two FEL modules were moved into NL07 and NL23 and one C100 was removed. In item [3] below Anna will tell us how they've started out.

Have started to turn everything on. Injector checked out to 100 muA but still adjustment to do. Beam has been through both linacs now. C100s seem to be generating vacuum excursions when operated at max gradient. The Gsets are being reduced on some cavities to as low as 8 MV/m to get stable ops. Not clear where we'll end up in energy yet.

2. TTC Meeting and new info on particulates (Geng)

TTC Program

3. CEBAF Turnon Status (Solopova)

C100 Status at Turnon

4. C100 Refurbishment Planning (Krafft, Reilly)

C100 System Improvement Discussion

Items Request Email

C100 Refurbishment Brainstorming List

Tony's C100 Refurbishment Brainstorming ppt

Action Items

Leadership of quenches. Offline discussion.

C100 Refurbishment Project for the future?