== Attendance ==
 
== Attendance ==
  
R. Bachimanchi, K. Baggett, J. Benesch, A. Freyberger, R. Geng, G. Krafft, A. Kimber, R. Legg, F. Marhauser, R. Nelson, T. Plawski, R. Rimmer, and H. Wang.
+
R. Bachimanchi, K. Baggett, J. Benesch, A. Freyberger, R. Geng, G. Krafft, A. Kimber, R. Legg, F. Marhauser, C. Mounts, R. Nelson, T. Plawski, T. Powers, R. Rimmer, and H. Wang.
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==
Line 11: Line 11:
 
an average current limit around the spec average current of
 
an average current limit around the spec average current of
 
460 muA 5 pass beam. This current has been briefly achieved,
 
460 muA 5 pass beam. This current has been briefly achieved,
but steady Os at around 325 muA. BBU looked for but none
+
but steady OPs at around 325 muA. BBU looked for but none
 
obviously present. Much optics work has cleaned up beam and
 
obviously present. Much optics work has cleaned up beam and
 
made more substantial apertures, but the average current limitation
 
made more substantial apertures, but the average current limitation

Revision as of 14:28, 26 February 2018

Attendance

R. Bachimanchi, K. Baggett, J. Benesch, A. Freyberger, R. Geng, G. Krafft, A. Kimber, R. Legg, F. Marhauser, C. Mounts, R. Nelson, T. Plawski, T. Powers, R. Rimmer, and H. Wang.

Agenda and Notes

1. Operations Status and Summary/Review (Freyberger)

Four Hall Ops has started. Have had a rough couple weeks as the beam average current was raised. CEBAF seems to have an average current limit around the spec average current of 460 muA 5 pass beam. This current has been briefly achieved, but steady OPs at around 325 muA. BBU looked for but none obviously present. Much optics work has cleaned up beam and made more substantial apertures, but the average current limitation remains. OPS trip rates now dominated by RF trips. Beam current has been up to about

C75 Review completed. Will post review report when available.

RF separators seem to have settled down.

2. Beam Loading and Q_ext (Krafft)

Jay has gathered some data that indicates that perhaps the Q_ext on many cavities is incorrect. This means the RF systems are not matched to the cavities at the highest operating currents, leading to addition power loads on the klystrons. Could this be a contributor to the average current limits?

Presentation on Optimal Qext

CED All Qs list

Xcel with power calculations

3. Draft Cryomodule Specification (Benesch)

Jay has written up a set of goals for the cryomodules: Draft Cryomodule Specification

4. Draft Acceptance Criteria (Legg)

Bob shared the LCLS II module acceptance criteria that the LCLS II project is working under. We should perhaps adopt something similar for C75? (Discuss Pros and Cons)

LCLS II Module Acceptance Criteria

Frank and Gigi (mainly) have written up a C75 performance specification document.

JLAB-TN-17-055: Draft C75 Specification Document

Action Items

Leadership of quenches. Offline discussion.

Complete C75 Module Specifications (Marhauser, Benesch, Krafft)

C100 Refurbishment Project for the future?