Difference between revisions of "PITMinutes 02-05-2017"

From CASA Wiki
Jump to: navigation, search
(Agenda and Notes)
Line 1: Line 1:
 
== Attendance ==
 
== Attendance ==
  
R. Bachimanchi, K. Baggett, J. Benesch, G. Ciovati, C. Hovater, A. Freyberger, R. Geng, G. Krafft, A. Kimber, F. Marhauser, C. Mounts, T. Plawski, C. Reece, R. Rimmer, D. Seidman, and H. Wang.
+
R. Bachimanchi, K. Baggett, J. Benesch, A. Freyberger, R. Geng, G. Krafft, A. Kimber, R. Legg, F. Marhauser, R. Nelson, T. Plawski, R. Rimmer, and H. Wang.
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==
Line 8: Line 8:
  
 
Four Hall Ops has started. Beam current has been up to about  
 
Four Hall Ops has started. Beam current has been up to about  
one pass (300 muA in the
+
300 muA total in both linacs. RF not entirely stable yet, but
both Linacs) RF not entirely stable yet, but no indication of BBU instability yet. Keeping my
+
no indication of BBU instability yet. Keeping my
fingers crossed. We've had beam loss and lots of separator tuning. Haven't
+
fingers crossed.
 +
 
 +
We've had beam loss and lots of separator tuning. Haven't
 
seen clear hot spots. 5 RF trips/hr and 5 MPS trips/hr. Fluctuating RF?
 
seen clear hot spots. 5 RF trips/hr and 5 MPS trips/hr. Fluctuating RF?
  
will be increasing current soon.
+
Because no hot spots observed, will be increasing current soon.
  
 
C75 Review will be held Thursday Feb. 15. Here is the talk repository.
 
C75 Review will be held Thursday Feb. 15. Here is the talk repository.
 +
 +
  
 
Practice session will be held this Friday, Feb. 9 in this room.
 
Practice session will be held this Friday, Feb. 9 in this room.

Revision as of 15:39, 5 February 2018

Attendance

R. Bachimanchi, K. Baggett, J. Benesch, A. Freyberger, R. Geng, G. Krafft, A. Kimber, R. Legg, F. Marhauser, R. Nelson, T. Plawski, R. Rimmer, and H. Wang.

Agenda and Notes

1. Operations Status and Summary/Review (Freyberger)

Four Hall Ops has started. Beam current has been up to about 300 muA total in both linacs. RF not entirely stable yet, but no indication of BBU instability yet. Keeping my fingers crossed.

We've had beam loss and lots of separator tuning. Haven't seen clear hot spots. 5 RF trips/hr and 5 MPS trips/hr. Fluctuating RF?

Because no hot spots observed, will be increasing current soon.

C75 Review will be held Thursday Feb. 15. Here is the talk repository.


Practice session will be held this Friday, Feb. 9 in this room.

2. Installation of FEL Cryomodules (Baggett)


3. Draft C75 Risk Assessment (Krafft)

Draft Risk Presentation for C75 Review

4. Draft Cryomodule Specification (Benesch)

Jay has written up a set of goals for the cryomodules: Draft Cryomodule Specification

5. Draft Acceptance Criteria (Legg)

Bob shared the LCLS II module acceptance criteria that the LCLS II project is working under. We should perhaps adopt something similar for C75? (Discuss Pros and Cons)

LCLS II Module Acceptance Criteria

Frank and Gigi (mainly) have written up a C75 performance specification document.

JLAB-TN-17-055: Draft C75 Specification Document

Action Items

Leadership of quenches. Offline discussion.

Complete C75 Module Specifications (Marhauser, Benesch, Krafft)

C100 Refurbishment Project for the future?