(New page: == Attendance == R. Bachimanchi, K. Baggett, J. Benesch, G. Ciovati, C. Hovater, A. Freyberger, R. Geng, G. Krafft, A. Kimber, F. Marhauser, C. Mounts, T. Plawski, C. Reece, R. Rimmer, D....)
 
Line 12: Line 12:
 
2. Installation of FEL Cryomodule (Baggett)
 
2. Installation of FEL Cryomodule (Baggett)
  
Frank and Gigi (mainly) have written up a C75 performance specification
 
document. We are gathered here to: "Speak Now, or forever hold your peace!"
 
 
[https://casa.jlab.org/LINACPIT/2017-11-22_Draft_3.0.pdf JLAB-TN-17-055: Draft C75 Specification Document]
 
  
 
3. Draft C75 Risk Assessment (Krafft)
 
3. Draft C75 Risk Assessment (Krafft)
Line 34: Line 30:
 
[https://casa.jlab.org/LINACPIT/Acceptance_criteria.pptx LCLS II Module Acceptance Criteria]
 
[https://casa.jlab.org/LINACPIT/Acceptance_criteria.pptx LCLS II Module Acceptance Criteria]
  
 +
Frank and Gigi (mainly) have written up a C75 performance specification
 +
document.
  
 +
[https://casa.jlab.org/LINACPIT/2017-11-22_Draft_3.0.pdf JLAB-TN-17-055: Draft C75 Specification Document]
  
  

Revision as of 14:17, 5 February 2018

Attendance

R. Bachimanchi, K. Baggett, J. Benesch, G. Ciovati, C. Hovater, A. Freyberger, R. Geng, G. Krafft, A. Kimber, F. Marhauser, C. Mounts, T. Plawski, C. Reece, R. Rimmer, D. Seidman, and H. Wang.

Agenda and Notes

1. Operations Status and Summary/Review (Freyberger)

Beam On! Physics starting. SRF systems detected, by tripping, the 5.1 Richter earthquake centerred in Dover, DE.

2. Installation of FEL Cryomodule (Baggett)


3. Draft C75 Risk Assessment (Krafft)

Draft Risk Presentation for C75 Review

4. Draft Cryomodule Specification (Benesch)

Jay has written up a set of goals for the cryomodules: Draft Cryomodule Specification

5. Draft Acceptance Criteria (Legg)

Bob shared the LCLS II module acceptance criteria that the LCLS II project is working under. We should perhaps adopt something similar for C75? (Discuss Pros and Cons)

LCLS II Module Acceptance Criteria

Frank and Gigi (mainly) have written up a C75 performance specification document.

JLAB-TN-17-055: Draft C75 Specification Document


Action Items

Leadership of quenches. Offline discussion.

Complete C75 Module Specifications (Marhauser, Benesch, Krafft)

C100 Refurbishment Project for the future?