Difference between revisions of "PITMinutes 12-04-2017"

From CASA Wiki
Jump to: navigation, search
Line 10: Line 10:
 
centerred in Dover, DE.
 
centerred in Dover, DE.
  
3. C75 Cavity Performance Specifications Signoff (Krafft, Hovater, Freyberger)
+
2. C75 Cavity Performance Specifications Signoff (Krafft, Hovater, Freyberger)
  
 
Freyberger updated on the status of the performance plan (approved!)
 
Freyberger updated on the status of the performance plan (approved!)
Line 33: Line 33:
  
 
3. Draft Acceptance Criteria (Legg)
 
3. Draft Acceptance Criteria (Legg)
 +
Bob shared the LCLS II module acceptance criteria that the
 +
LCLS II project is working under. We should perhaps adopt something
 +
similar for C75? (Discuss Pros and Cons)
  
[https://casa.jlab.org/LINACPIT/Lead_Collars_For_C100s_Update.pdf Recent Tests with Lead Collars]
+
[https://casa.jlab.org/LINACPIT/Acceptance_criteria.pptx LCLS II Module Acceptance Criteria]
  
  
 
Discussed whether to have an internal review. Committee (Kimber, Geng, Bickley, volunteers)
 
 
Review: proposed date for Review
 
Jan 11, 2018
 
Target audience: Will, AD,
 
Hutton Chair: Phillip, Bickley, and Geng members.
 
 
New Cu coated waveguide?
 
 
In out years is bottleneck having enough end groups?
 
 
 
Rec approved for getting cavity material proc started.
 
  
  

Revision as of 15:01, 1 December 2017

Attendance

R. Bachimanchi, K. Baggett, G. Ciovati, M. Drury, C. Hovater, A. Freyberger, R. Geng, G. Krafft, A. Kimber, R. Legg, F. Marhauser, C. Mounts, T. Plawski, C. Reece, and H. Wang.

Agenda and Notes

1. Operations Status and Summary (Freyberger)

Beam On! Physics starting. SRF systems detected, by tripping, the earthquake centerred in Dover, DE.

2. C75 Cavity Performance Specifications Signoff (Krafft, Hovater, Freyberger)

Freyberger updated on the status of the performance plan (approved!) Need to have some agreed upon specs for project. F. Marhauser has made a start. When document blessed, we'll send it around. Table from Arne's AAC talk.

Spec Signoff Monday Morning after Thanksgiving. Spoke posted here Requirement 70 MeV with beam for 1 module 460 muA. 19.07 @ 8e9 Q-0


C75 Draft Specifications

JLAB-TN-17-055: Draft C75 Specification Document

2. Draft Cryomodule Specification (Benesch)

Jay has written up a set of goals for the cryomodules: Draft Cryomodule Specification

3. Draft Acceptance Criteria (Legg) Bob shared the LCLS II module acceptance criteria that the LCLS II project is working under. We should perhaps adopt something similar for C75? (Discuss Pros and Cons)

LCLS II Module Acceptance Criteria



Action Items

Leadership of quenches. Offline discussion.

Complete C75 Module Specifications (Marhauser, Krafft)

C100 Refurbishment Project for the future?