Difference between revisions of "PITMinutes 09-26-2016"
From CASA Wiki
Line 6: | Line 6: | ||
1. Operations Status and Summary | 1. Operations Status and Summary | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
Field Emission and Radiation Measurements. | Field Emission and Radiation Measurements. | ||
accumulation downstream. Cavity-cavity and module to module. | accumulation downstream. Cavity-cavity and module to module. | ||
− | + | C100 He processing. | |
− | + | ||
− | C100 He processing | + | |
− | + | ||
2. Gradient Team (Bob Legg) | 2. Gradient Team (Bob Legg) |
Revision as of 13:30, 26 September 2016
Attendance
R. Bachimanchi, G. Ciovati, C. Hovater, G. Krafft, A. Kimber, R. Legg, C. Mounts, R. Nelson, T. Powers, T. Reilly, C. Reece, B. Rimmer
Agenda and Notes
1. Operations Status and Summary
Field Emission and Radiation Measurements. accumulation downstream. Cavity-cavity and module to module.
C100 He processing.
2. Gradient Team (Bob Legg)
First Pass at closeout document Process to close out with stakeholders Return to Pre-team
4. Field Emitters Movement (Geng/Zhang)
Indigo Site available The indico web site for the followup meeting is
5. General Discussion on Future Directions (Krafft)
6. Regular Reporting