Difference between revisions of "PITMinutes 08-29-2016"

From CASA Wiki
Jump to: navigation, search
(New page: == Attendance == R. Bachimanchi, C. Hovater, G. Krafft, A. Kimber, C. Mounts, R. Nelson, T. Powers, T. Reilly, C. Reece, B. Rimmer == Agenda and Notes == 1. Operations Status and Summar...)
 
Line 6: Line 6:
  
 
1. Operations Status and Summary
 
1. Operations Status and Summary
 +
 +
C50-12 installed. Commissioning and
 +
checkout ???.
  
  
Line 18: Line 21:
 
[https://casa.jlab.org/LINACPIT/Girder_Particulate_Summary2016-08-15b.pptx Girder Particulate Summary]
 
[https://casa.jlab.org/LINACPIT/Girder_Particulate_Summary2016-08-15b.pptx Girder Particulate Summary]
  
4. C75 (Gigi/Bob)
+
4. C75 Mock-up Results (Gigi/Bob)
  
 
Mock-up to be tested this week.
 
Mock-up to be tested this week.
Line 25: Line 28:
 
at HOM Qs and Q0 vs. E
 
at HOM Qs and Q0 vs. E
  
C75 or C50 next year? Brief discussion. As not
 
approved by Mont, looks like need to wait till
 
13th refurbished module. Need to still complete
 
data gathering for future C75
 
  
 
5. Follow up Field emission Workshop (Geng)
 
5. Follow up Field emission Workshop (Geng)

Revision as of 12:59, 29 August 2016

Attendance

R. Bachimanchi, C. Hovater, G. Krafft, A. Kimber, C. Mounts, R. Nelson, T. Powers, T. Reilly, C. Reece, B. Rimmer

Agenda and Notes

1. Operations Status and Summary

C50-12 installed. Commissioning and checkout ???.


2. Microphonics (Powers)


Powers Strike Movie of Module Oscillation

3. Girder Particulate Summary (Reece)


Girder Particulate Summary

4. C75 Mock-up Results (Gigi/Bob)

Mock-up to be tested this week.

First look at HOM Qs and Q0 vs. E


5. Follow up Field emission Workshop (Geng)

Tentative Date September 12. Whole afternoon Subscribed. This room.

Preliminay agenda

Tentative Agenda


3. LLRF Firmware Recs Summary (Rama)

LLRF FIrmware Recommendations


Girder Particulate Summary

Action Items