Difference between revisions of "PITMinutes 06-06-2016"

From CASA Wiki
Jump to: navigation, search
Line 34: Line 34:
  
 
4. Effects of desorbed gas on FE (Geng)
 
4. Effects of desorbed gas on FE (Geng)
 +
 +
[https://casa.jlab.org/html/LINACPIT/C100_Moduledsweb/Get/Document-117729/16-008.pdf Field Emission/ Talk]
 +
  
  
  
 
== Action Items ==
 
== Action Items ==

Revision as of 14:14, 6 June 2016

Attendance

S. Cooper, M. Drury, A. Freyberger, R. Geng, C. Hovater, A. Hutton, G. Krafft, A. Kimber, R. Nelson, T. Powers, C. Reece, T. Reilly, R. Rimmer, S. Suhring

Agenda and Notes

1. Operations Status and Summary

heater testing in R100

microphonic damping feet on 0L04: didn't fit keep trying new feet problems also.


2. Stay-treat program (Implications for PIT) (Freyberg)

Ops 2016 StayTreat Agenda https://docs.google.com/spreadsheets/d/1mZAcT4FgPV9hIcK2XVacM2uR5s5q-DNBpqV-Di3xa74/edit#gid=591661138


3. C50-12 Warm Girder Study Plan (Freyberg)

Added valve update and replacement to allow work, Warm regions will be pulled and looked at and processed in SRF institute. Studies of warm girders next to the removed 1L12 cryomodule. Cryogenic planning for C50-12 discussed at 2:30. May have to warm up NL10 and NL14 also. Talk through cycling of internal valves from contamination point of view.

Clean interior of both sides.

4. Effects of desorbed gas on FE (Geng)

Field Emission/ Talk



Action Items