(Agenda and Notes)
Line 14: Line 14:
 
Klystron spares gone. Switches to power starved cavities
 
Klystron spares gone. Switches to power starved cavities
 
accomplished. Between 2 and 5 MeV energy gain.
 
accomplished. Between 2 and 5 MeV energy gain.
 +
 +
Vacuum spikes to reliablility (Talk@Staytreat)
  
  

Revision as of 13:45, 9 May 2016

Attendance

S. Cooper, M. Drury, A. Freyberger, C. Hovater, G. Krafft, F. Marhauser, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, T. Rielly, S. Suhring

Agenda and Notes

1. Operations Status and Summary

OPS Staytreat Focus on reliability

Stonger SRF Compenent Again discussion

Klystron spares gone. Switches to power starved cavities accomplished. Between 2 and 5 MeV energy gain.

Vacuum spikes to reliablility (Talk@Staytreat)


2. Why have we lost 15-25 MV/module compared to commissioning period?


3. FE/Particulate Meeting Report (Geng)

Follow on activity and future planning


4. Capture degradation rate?

Look at archiver data and compare?

Other ideas?

Action Items