(New page: == Attendance == R. Bachimanchi, S. Cooper, E. Daly, K. Davis, M. Drury, C. Hovater, R. Geng, A. Hutton, L. King, G. Krafft, F. Marhauser, C. Mounts, C. Reece, T. Reilly, R. Rimmer, T. Po...)
 
Line 7: Line 7:
 
1. Operations Status and Summary
 
1. Operations Status and Summary
  
 +
Heat Measurement Status
  
 
Piezo work started on R100. Should be possible to
 
Piezo work started on R100. Should be possible to

Revision as of 14:24, 15 February 2016

Attendance

R. Bachimanchi, S. Cooper, E. Daly, K. Davis, M. Drury, C. Hovater, R. Geng, A. Hutton, L. King, G. Krafft, F. Marhauser, C. Mounts, C. Reece, T. Reilly, R. Rimmer, T. Powers, H. Wang

Agenda and Notes

1. Operations Status and Summary

Heat Measurement Status

Piezo work started on R100. Should be possible to get some microphonic damping. Stay tuned, code/software problems.

Regular beam studies on Tuesdays and thursdays for RF recovery.

One hour machine ops devoted to Fast X-ray detection of FE, able to tune for reduced losses in . Establish baselines for future comparisons.

C100 tests (determine best pressure "defined by highest operating gradient" to operate at)

Got 70% of cavities back up to E_maxop values, but were having cooling/instability problems when operating at high values.

destinguish/study SEL GDR trip differences (Rama)

Future mechanical investigations to elliminate vibrations in the first place may be appropriate going forward.

2. Superinsulation Damage? (???)

3. R&D for improving and maintaining CEBAF gradient (in situ?)

Action Items