Difference between revisions of "PITMinutes 01-10-2020"
From CASA Wiki
(→Agenda and Notes) |
(→Agenda and Notes) |
||
Line 16: | Line 16: | ||
[https://casa.jlab.org/LINACPIT/CEBAF_Design_Handbook_Linac_Vacuum_section.docx Linac Vacuum Section: CEBAF Design Handbook] | [https://casa.jlab.org/LINACPIT/CEBAF_Design_Handbook_Linac_Vacuum_section.docx Linac Vacuum Section: CEBAF Design Handbook] | ||
− | [https://casa.jlab.org/LINACPIT/ | + | [https://casa.jlab.org/LINACPIT/CEBAF_Vacuum_Interlocks_r2.docx Vacuum Interlocks Modifications Proposed] |
[https://casa.jlab.org/LINACPIT/PIT_meeting_Draft_Vacuum_Interlock_Modifications_2Dec19.pptx Vacuum Interlocks Modifications Proposed] | [https://casa.jlab.org/LINACPIT/PIT_meeting_Draft_Vacuum_Interlock_Modifications_2Dec19.pptx Vacuum Interlocks Modifications Proposed] |
Revision as of 09:34, 8 January 2020
Attendance
K. Baggett, M. Bickley, M. Drury, C. Hovater, R. Geng, C. Ginsburg, A. Hutton, A. Kimber, G. Krafft, F. Marhauser, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, R. Rimmer, and A. Solopova
Agenda and Notes
1. Operations Status and Summary/Review (Bickley)
Restart is proceding/
2. Warm Region Vacuum Specifications (Preble)
CEBAF Vacuum: "Cold" Vacuum System and Interlocks Interlocks
Linac Vacuum Section: CEBAF Design Handbook
Vacuum Interlocks Modifications Proposed
Vacuum Interlocks Modifications Proposed
Vacuum Interlocks Modifications Proposed
Vacuum Interlocks Modifications Proposed
3. Particle Counter Update (Geng)