Difference between revisions of "PITMinutes 10-07 and 14-2019"

From CASA Wiki
Jump to: navigation, search
(Agenda and Notes)
(Agenda and Notes)
Line 52: Line 52:
 
1:50      RF Configuration after SAD    (Hovater)
 
1:50      RF Configuration after SAD    (Hovater)
  
Comments:
+
Comments: Expectations for NL07 gradient 35-40 MeV energy
 +
gain from meeting discussion. This means a net gain of 25-30 MeV.
 +
NL07 will have new LLRF system (LCLS-II like).
 +
Gradients, from an RF point of view, are likely not limited
 +
at low average current. Because of power limitations at
 +
high current (the near-term program max is 300 muA total
 +
average current), the cavities running above about 10 MV/m
 +
may have to be turned down. This effect included in energy
 +
estimate above.
  
  

Revision as of 10:21, 14 October 2019

Attendance

M. Aiken, R. Bachimanchi, K. Baggett, J. Benesch, E. Daly, M. Drury, B. Freeman, C. Hovater, J. Grames, C. Ginsburg, A. Kimber, G. Krafft, R. Michaud, C. Mounts, R. Nelson, T. Plawski, T. Powers, Y. Roblin, M. Spata, A. Solopova, S. Suhring, M. Tiefenback, and P. Vasilauskis.

Agenda and Notes

1. Extended PIT Meeting (Resumption of Operations)

1:00 Goal for Meeting (Ginsburg)

Goal for Meeting

Comments:


1:10 Experiment Requirements and Desires for next running periods (HALL APLs, Grames)

Posted Fall Running (Grames)

Document on Hall B Run Requirements (Tiefenback)

Hall C Run Requirements (Benesch)

Standard form Hall B Run Requirements (Tiefenback)

Standard form Hall C Run Requirements (Benesch)

Comments: Test early at 300 muA will bge tried. A High current (150 muA) 1 pass running. Not too much stress! 30 muA to C is a target max. A could run at lower energy with benefit. High current parity quality. trip interaction with target not bad. Question, stability of the match into hal depends on the gradient distribution. Two hours up to several days to correct. can pre-prepare matches. 10.6 GeV needed to get beyond a physics threshold. 10.5 not good enough. energy in slide. Target faults. Slides from all Halls.

Here is a tech note from 31 March 2018 summarizing expected requirements for all Halls at the time

12 GeV Beam Parameter Tables (Benesch, et al.)



1:25 Performance Expectations in Relocated Modules (Drury)

Expected Performance After CM Swaps (Drury)

1:50 RF Configuration after SAD (Hovater)

Comments: Expectations for NL07 gradient 35-40 MeV energy gain from meeting discussion. This means a net gain of 25-30 MeV. NL07 will have new LLRF system (LCLS-II like). Gradients, from an RF point of view, are likely not limited at low average current. Because of power limitations at high current (the near-term program max is 300 muA total average current), the cavities running above about 10 MV/m may have to be turned down. This effect included in energy estimate above.



Second Day of Meeting on 10-14-2019


1:30 Gradient Choice at Turnon (Benesch)

Fall Polarization Options (Benesch)

Fall Turnon Gradient Choice (Benesch)

1:40 Present Gradient Limitations (Drury)

Data from Commissioning (Drury)

1:50 Running the Cavities at Turnon (Mounts)

Data from Commissioning (Drury)

2:20 Gradient Change Instructions for OPS (Solopova)

Gradient Change Instruction for OPS (Solopova)

Comments:

2:40 Normal Conducting Systems (Plawski)

Normal Conducting Systems (Plawski)


3:00 Energy Reach (Baggett)

Energy Reach Fall 2019 (Baggett)

Comments:


3:15 CEBAF Performance Plan (Michaud)

CEBAF Performance Plan (Michaud)

Comments: