Line 37: Line 37:
 
threshold. 10.5 not good enough. energy in slide. Target faults.
 
threshold. 10.5 not good enough. energy in slide. Target faults.
 
Slides from all Halls.
 
Slides from all Halls.
 +
 +
Here is a tech note from 31 March 2018 summarizing expected requirements
 +
for all Halls at the time
 +
 +
[https://casa.jlab.org/LINACPIT/31March2018_Parameter_Table_Document.pdf 12 GeV Beam Parameter Tables (Benesch, et al.)]
  
  

Revision as of 09:50, 11 October 2019

Attendance

M. Aiken, R. Bachimanchi, K. Baggett, J. Benesch, E. Daly, M. Drury, B. Freeman, C. Hovater, J. Grames, C. Ginsburg, A. Kimber, G. Krafft, R. Michaud, C. Mounts, R. Nelson, T. Plawski, T. Powers, Y. Roblin, M. Spata, A. Solopova, S. Suhring, M. Tiefenback, and P. Vasilauskis.

Agenda and Notes

1. Extended PIT Meeting (Resumption of Operations)

1:00 Goal for Meeting (Ginsburg)

Goal for Meeting

Comments:


1:10 Experiment Requirements and Desires for next running periods (HALL APLs, Grames)

Posted Fall Running (Grames)

Hall B Run Requirements (Tiefenback)

Halls A and D Run Requirements (Benesch)

Document on Hall B Run Requirements (Tiefenback)

Hall C Run Requirements (Benesch)

Comments: Test early at 300 muA will bge tried. A High current (150 muA) 1 pass running. Not too much stress! 30 muA to C is a target max. A could run at lower energy with benefit. High current parity quality. trip interaction with target not bad. Question, stability of the match into hal depends on the gradient distribution. Two hours up to several days to correct. can pre-prepare matches. 10.6 GeV needed to get beyond a physics threshold. 10.5 not good enough. energy in slide. Target faults. Slides from all Halls.

Here is a tech note from 31 March 2018 summarizing expected requirements for all Halls at the time

12 GeV Beam Parameter Tables (Benesch, et al.)



1:25 Performance Expectations in Relocated Modules (Drury)

Expected Performance After CM Swaps (Drury)

1:50 RF Configuration after SAD (Hovater)

Comments:



Second Day of Meeting on 10-14-2019


1:30 Gradient Choice at Turnon (Benesch)

Fall Polarization Options (Benesch)

Fall Turnon Gradient Choice (Benesch)

1:40 Present Gradient Limitations (Drury)

Data from Commissioning (Drury)

1:50 Running the Cavities at Turnon (Mounts)

Data from Commissioning (Drury)

2:20 Gradient Change Instructions for OPS (Solopova)

Gradient Change Instruction for OPS (Solopova)

Comments:

2:40 Normal Conducting Systems (Plawski)

Normal Conducting Systems (Plawski)


3:00 Energy Reach (Baggett)

Energy Reach Fall 2019 (Baggett)

Comments:


3:15 CEBAF Performance Plan (Michaud)

CEBAF Performance Plan (Michaud)