Difference between revisions of "PITMinutes 10-07-2019"

From CASA Wiki
Jump to: navigation, search
(Attendance)
(Agenda and Notes)
Line 10: Line 10:
  
 
[https://casa.jlab.org/LINACPIT/20191007_PIT_SRFConfig-Ginsburg.pptx Goal for Meeting]
 
[https://casa.jlab.org/LINACPIT/20191007_PIT_SRFConfig-Ginsburg.pptx Goal for Meeting]
 +
 +
Comments:
  
 
1:10      Experiment Requirements and Desires for next running periods  (HALL APLs, Grames)
 
1:10      Experiment Requirements and Desires for next running periods  (HALL APLs, Grames)
Line 16: Line 18:
  
 
[https://casa.jlab.org/LINACPIT/HallC_FY20_reqs_benesch.pdf Hall C Run Requirements (Benesch)]
 
[https://casa.jlab.org/LINACPIT/HallC_FY20_reqs_benesch.pdf Hall C Run Requirements (Benesch)]
 +
 +
Comments:
  
 
1:25      Performance Expectations in Relocated Modules  (Drury)
 
1:25      Performance Expectations in Relocated Modules  (Drury)
Line 22: Line 26:
  
 
1:50      RF Configuration after SAD    (Hovater)
 
1:50      RF Configuration after SAD    (Hovater)
 +
 +
 +
Comments:
  
 
1:55      Gradient Choice at Turnon      (Benesch)
 
1:55      Gradient Choice at Turnon      (Benesch)
Line 36: Line 43:
  
 
[https://casa.jlab.org/LINACPIT/Gradient_Change_Instructions_for_OPS.pptx Gradient Change Instruction for OPS (Solopova)]
 
[https://casa.jlab.org/LINACPIT/Gradient_Change_Instructions_for_OPS.pptx Gradient Change Instruction for OPS (Solopova)]
 +
 +
 +
Comments:
  
 
2:40      Energy Reach  (Baggett)
 
2:40      Energy Reach  (Baggett)
 +
 +
Comments:
  
 
2:50      CEBAF Performance Plan                      (Michaud)
 
2:50      CEBAF Performance Plan                      (Michaud)
  
 
[https://casa.jlab.org/LINACPIT/PIT_Meeting.pdf Gradient Change Instruction for OPS (Michaud)]
 
[https://casa.jlab.org/LINACPIT/PIT_Meeting.pdf Gradient Change Instruction for OPS (Michaud)]
 +
 +
Comments:

Revision as of 12:35, 7 October 2019

Attendance

R. Bachimanchi, K. Baggett, J. Benesch, E. Daly, M. Drury, C. Hovater, R. Geng, C. Ginsburg, G. Krafft, F. Marhauser, C. Mounts, T. Plawski, T. Powers, C. Reece, R. Rimmer, A. Solopova, and .

Agenda and Notes

1. Extended PIT Meeting (Resumption of Operations)

1:00 Goal for Meeting (Ginsburg)

Goal for Meeting

Comments:

1:10 Experiment Requirements and Desires for next running periods (HALL APLs, Grames)

Posted Fall Running (Grames)

Hall C Run Requirements (Benesch)

Comments:

1:25 Performance Expectations in Relocated Modules (Drury)

Expected Performance After CM Swaps (Drury)

1:50 RF Configuration after SAD (Hovater)


Comments:

1:55 Gradient Choice at Turnon (Benesch)

Fall Polarization Options (Benesch)

Fall Turnon Gradient Choice (Benesch)

2:05 Present Gradient Limitations (Drury)

Data from Commissioning (Drury)

2:25 Gradient Change Instructions for OPS (Solopova)

Gradient Change Instruction for OPS (Solopova)


Comments:

2:40 Energy Reach (Baggett)

Comments:

2:50 CEBAF Performance Plan (Michaud)

Gradient Change Instruction for OPS (Michaud)

Comments: