Difference between revisions of "PITMinutes 10-07-2019"

From CASA Wiki
Jump to: navigation, search
(Created page with "== Attendance == R. Bachimanchi, K. Baggett, J. Benesch, E. Daly, M. Drury, C. Hovater, R. Geng, C. Ginsburg, G. Krafft, F. Marhauser, C. Mounts, T. Plawski, T. Powers, C. Re...")
 
(Agenda and Notes)
Line 8: Line 8:
  
 
1:00      Goal for Meeting    (Ginsburg)
 
1:00      Goal for Meeting    (Ginsburg)
 +
 +
[https://casa.jlab.org/LINACPIT/Fault_Waveforms_RF_PIT_23Sept19.pptx Goal for Meeting]
  
 
1:10      Experiment Requirements and Desires for next running periods  (HALL APLs, Grames)
 
1:10      Experiment Requirements and Desires for next running periods  (HALL APLs, Grames)

Revision as of 07:44, 4 October 2019

Attendance

R. Bachimanchi, K. Baggett, J. Benesch, E. Daly, M. Drury, C. Hovater, R. Geng, C. Ginsburg, G. Krafft, F. Marhauser, C. Mounts, T. Plawski, T. Powers, C. Reece, A. Rimmer, and A. Seryi.

Agenda and Notes

1. Extended PIT Meeting (Resumption of Operations)

1:00 Goal for Meeting (Ginsburg)

Goal for Meeting

1:10 Experiment Requirements and Desires for next running periods (HALL APLs, Grames)

1:25 SRF Configuration after SAD (Reilly)

1:35 RF Configuration after SAD (Hovater)

1:45 Performance Expectations in Relocated Modules (Drury)

1:55 Gradient Choice at Turnon (Benesch)

2:05 Options for Pushing the Gradient (Drury)

2:25 Gradient Change Instructions for OPS (Solopova)

2:40 Energy Reach (Baggett)

2:50 CEBAF Performance Plan (Michaud)