Difference between revisions of "PITMinutes 05-06-2019"
From CASA Wiki
Line 13: | Line 13: | ||
2. RF Fault analysis (Plawski) | 2. RF Fault analysis (Plawski) | ||
− | + | By varying mixing frequencies, clock eliminated as a source of noise | |
− | + | ||
− | + | ||
[https://casa.jlab.org/LINACPIT/LLRF_2_X_transmitter_performance.pptx LLRF Transmitter] | [https://casa.jlab.org/LINACPIT/LLRF_2_X_transmitter_performance.pptx LLRF Transmitter] |
Latest revision as of 14:50, 6 May 2019
Attendance
R. Bachimanchi, M. Bickley, R. Geng, C. Hovater, G. Krafft, A. Kimber, F. Marhauser, R. Nelson, T. Plawski, and T. Powers.
Agenda and Notes
1. Operations Status and Summary/Review (Bickley)
Continued quiet running at reduced energy. 85% availability at low energy.
2. RF Fault analysis (Plawski)
By varying mixing frequencies, clock eliminated as a source of noise
3. C100 Cavity/Cryomnodule Modifications (Marhauser)
Spread sheet for performance prediction has been created. Many different scenarios may now be investigated.
Energy Reach Calculator/Predictor
Action Items
Leadership of quenches. Offline discussion.
C100 Refurbishment Project for the future?