Difference between revisions of "PITMinutes 05-06-2019"
From CASA Wiki
Line 16: | Line 16: | ||
the field energy leaves the cavities too quickly. Some | the field energy leaves the cavities too quickly. Some | ||
preliminary investigations | preliminary investigations | ||
− | |||
[https://casa.jlab.org/LINACPIT/LLRF_2_X_transmitter_performance.pptx LLRF Transmitter] | [https://casa.jlab.org/LINACPIT/LLRF_2_X_transmitter_performance.pptx LLRF Transmitter] | ||
− | |||
− | |||
3. Cryomnodule Modifications (Marhauser) | 3. Cryomnodule Modifications (Marhauser) |
Revision as of 13:31, 6 May 2019
Attendance
R. Bachimanchi, K. Baggett, M. Bickley, K. Davis, R. Geng, C. Hovater, G. Krafft, A. Kimber, R. Nelson, T. Plawski, T. Powers, and H. Wang.
Agenda and Notes
1. Operations Status and Summary/Review (Freyberger)
Continued quiet running at reduced energy. 85% availability at low energy.
2. RF Fault analysis (Plawski)
Many indicated quench faults are not real quenches because the field energy leaves the cavities too quickly. Some preliminary investigations
3. Cryomnodule Modifications (Marhauser)
Spread sheet for performance prediction has been created. Many different scenarios may now be investigated.
Energy Reach Calculator/Predictor
Action Items
Leadership of quenches. Offline discussion.
C100 Refurbishment Project for the future?