1. Operations Status and Summary/Review (Freyberger)
 
1. Operations Status and Summary/Review (Freyberger)
  
During SAD two FEL modules being moved into
+
During SAD two FEL modules were moved into
NL07 and NL23 (a C100 is being removed). This first
+
NL07 and NL23 and one C100 was removed. In
C100 cryomodule will be used as a feeder for the C100
+
item [3] below Anna will tell us how they've started
refurbishment program. More on this below.
+
out.
  
Current limits from previous minutes largely
+
Have started to turn everything on. Injector checked out
solved, if not completely understood, by injector
+
to 100 muA but still adjustment to do. Beam has been through
tuning elliminating beam haloes. Bunch length
+
both linacs now. C100s seem to be generating vacuum excursions
changes were effective in mitigating problem.
+
when operated at max gradient. The Gsets are being reduced on
Process Reza used could be incompatible with
+
some cavities to as low as 8 MV/m to get stable ops.
high quality parity measurements.
+
Not clear where we'll end up in energy yet.  
 
+
Some questions about HOM loads as installed in CEBAF.
+
P1 FEL configuration for all cavities after installation
+
back in CEBAF.
+
  
 
2. TTC Meeting and new info on particulates (Geng)
 
2. TTC Meeting and new info on particulates (Geng)

Revision as of 13:11, 13 August 2018

Attendance

R. Bachimanchi, K. Baggett, M. Drury, A. Freyberger, R. Geng, C. Hovater, G. Krafft, A. Kimber, R. Legg, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, T. Reilly, and A. Solopova.

Agenda and Notes

1. Operations Status and Summary/Review (Freyberger)

During SAD two FEL modules were moved into NL07 and NL23 and one C100 was removed. In item [3] below Anna will tell us how they've started out.

Have started to turn everything on. Injector checked out to 100 muA but still adjustment to do. Beam has been through both linacs now. C100s seem to be generating vacuum excursions when operated at max gradient. The Gsets are being reduced on some cavities to as low as 8 MV/m to get stable ops. Not clear where we'll end up in energy yet.

2. TTC Meeting and new info on particulates (Geng)

TTC Program

3. CEBAF Turnon Status (Solopova)

C100 Status at Turnon

4. C100 Refurbishment Planning (Krafft, Reilly)

C100 System Improvement Discussion

Items Request Email

C100 Refurbishment Brainstorming List

Tony's C100 Refurbishment Brainstorming ppt

5. NEGS for C75? (Ciovati, Reilly)

Waveguide Faults Summary

Answer to question: Yes!

Action Items

Leadership of quenches. Offline discussion.

Complete C75 Module Specifications (Marhauser, Benesch, Krafft)

C100 Refurbishment Project for the future?