Difference between revisions of "PITMinutes 05-07-2018"

From CASA Wiki
Jump to: navigation, search
(Agenda and Notes)
(Agenda and Notes)
Line 34: Line 34:
 
[https://casa.jlab.org/LINACPIT/C100_Refurbishment_Brainstorming_List.pptx C100 Refurbishment Brainstorming List]
 
[https://casa.jlab.org/LINACPIT/C100_Refurbishment_Brainstorming_List.pptx C100 Refurbishment Brainstorming List]
  
5. Draft Cryomodule Specification (Benesch)
 
  
Jay has written up a set of goals for the cryomodules:
 
[https://casa.jlab.org/LINACPIT/2017CM_specR2.pdf Draft Cryomodule Specification]
 
 
6. Draft Acceptance Criteria (Legg)
 
 
Bob shared the LCLS II module acceptance criteria that the
 
LCLS II project is working under. We should perhaps adopt something
 
similar for C75? (Discuss Pros and Cons)
 
  
 
[https://casa.jlab.org/LINACPIT/Acceptance_criteria.pptx LCLS II Module Acceptance Criteria]
 
[https://casa.jlab.org/LINACPIT/Acceptance_criteria.pptx LCLS II Module Acceptance Criteria]

Revision as of 12:40, 3 May 2018

Attendance

R. Bachimanchi, K. Baggett, M. Drury, A. Freyberger, R. Geng, A. Hutton, G. Krafft, A. Kimber, R. Legg, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, T. Reilly, R. Rimmer, and A. Solopova.

Agenda and Notes

1. Operations Status and Summary/Review (Freyberger)

High average current limits remain. Usually A runs 22.5 muA and C runs 50-60 muA. Seems more and more solid that the Hall C current limit is 70-75 muA, independent of the Hall A current. And the main trips are from beam loss. So focus is shifting back to injector. Today, bunch length measurements are being made for the different Hall bunches. Recent work points to longitudinal phase space tails causing high average current trips. Is there a better diagnostic for these?

Anna will be working on getting a handle on OPS-initiated reductions in the C100 cavity gradients. First try to understand why people are reducing them and work through mitigations.

2. C100 Performance Studies (Solopova)

C100 Performance Talk

3. C100 Quenches (Powers)

Measurement regarding C100 Quenches

4. C100 Refurbishment Planning (Freyberger)

Items Request Email

C100 Refurbishment Brainstorming List


LCLS II Module Acceptance Criteria

Action Items

Leadership of quenches. Offline discussion.

Complete C75 Module Specifications (Marhauser, Benesch, Krafft)

C100 Refurbishment Project for the future?