Difference between revisions of "PITMinutes 02-05-2017"

From CASA Wiki
Jump to: navigation, search
Line 7: Line 7:
 
1. Operations Status and Summary/Review (Freyberger)
 
1. Operations Status and Summary/Review (Freyberger)
  
Beam On! Physics starting. SRF systems detected, by tripping, the 5.1 Richter earthquake
+
Four Hall Ops has started. Beam current has been up to about 70 muA one pass (420 muA in the
centerred in Dover, DE.
+
North Linac) RF not entirely stable yet, but no indication of BBU instability yet. Keeping my
 +
fingers crossed.
 +
 
 +
C75 Review will be held Friday Feb. 15. Here is the talk repository.
 +
 
 +
Practice session will be held this Friday, Feb. 8 in this room.
  
 
2. Installation of FEL Cryomodule (Baggett)
 
2. Installation of FEL Cryomodule (Baggett)

Revision as of 14:24, 5 February 2018

Attendance

R. Bachimanchi, K. Baggett, J. Benesch, G. Ciovati, C. Hovater, A. Freyberger, R. Geng, G. Krafft, A. Kimber, F. Marhauser, C. Mounts, T. Plawski, C. Reece, R. Rimmer, D. Seidman, and H. Wang.

Agenda and Notes

1. Operations Status and Summary/Review (Freyberger)

Four Hall Ops has started. Beam current has been up to about 70 muA one pass (420 muA in the North Linac) RF not entirely stable yet, but no indication of BBU instability yet. Keeping my fingers crossed.

C75 Review will be held Friday Feb. 15. Here is the talk repository.

Practice session will be held this Friday, Feb. 8 in this room.

2. Installation of FEL Cryomodule (Baggett)


3. Draft C75 Risk Assessment (Krafft)

Draft Risk Presentation for C75 Review

4. Draft Cryomodule Specification (Benesch)

Jay has written up a set of goals for the cryomodules: Draft Cryomodule Specification

5. Draft Acceptance Criteria (Legg)

Bob shared the LCLS II module acceptance criteria that the LCLS II project is working under. We should perhaps adopt something similar for C75? (Discuss Pros and Cons)

LCLS II Module Acceptance Criteria

Frank and Gigi (mainly) have written up a C75 performance specification document.

JLAB-TN-17-055: Draft C75 Specification Document


Action Items

Leadership of quenches. Offline discussion.

Complete C75 Module Specifications (Marhauser, Benesch, Krafft)

C100 Refurbishment Project for the future?