5. Lead Collars (Legg)
 
5. Lead Collars (Legg)
  
[https://casa.jlab.org/LINACPIT/Lead_Collars_for_C100s.pdf Lead Collars for C100s]
+
[https://casa.jlab.org/LINACPIT/Lead_Collars_For_C100s.pdf Lead Collars for C100s]
  
  

Revision as of 11:43, 8 May 2017

Attendance

R. Bachimanchi, K. Baggett, E. Daly, A. Freyberger, C. Hovater, A. Hutton, G. Krafft, A. Kimber, R. Legg, M. McC. F. Marhauser, R. Nelson, T. Powers, T. Plawski, T. Reilly, R. Rimmer, and S. Suhring

Agenda and Notes

1. Operations Status and Summary

Recovery Plans. Still Diagnosing Cryo problems. Week or so to open cold compressor up. Getting old CC4 back in a couple weeks. If compressors not viable, will reconfigure. Only 4 K work over the summer. Probably no 2 K ops until late summer.

Gradient Achievement and maintenance plans being developed. Need 6-8 New C75 modules.

2. "Staytreat" Discussion Preliminary topics list have been uploaded. Meeting has been drifting back towards end of summer. Now August 2-3.


3. Performance of C57

Gradients of two reworked "C57" cavities are topping out in mid-teens of cavity gradient. Full upgrades of LLRF and klystrons not needed (still probably like hot klystrons on these cavities.


4. Backing Pump Discussion

Additional data mining performed. Consult with Benesch and . Gigi marcy looked at geome34try and suggested ,. Capacitor pumps on order anyway. Go through and sellect a promising module for test. 4 weeks plan will be presented. Next Steps


5. Lead Collars (Legg)

Lead Collars for C100s


Radiation shielding at end of C100s has been explored by Legg. preliminary design has been completed. goal to help save girders.

New module will be C57. More planning for the 2018 Module needed.

4. Particulates reporting; SRF in Dirty Machine Workshop: HZB. Josh, Tom, and Thomas in two weeks.

Girder Particulate Summary

Action Items