Difference between revisions of "Super-ferric Dipole and CIC Conductor Topic Meeting (March 14, 2017)"

From CASA Wiki
Jump to: navigation, search
Line 1: Line 1:
 +
<UL>
 +
<li>Working Group/Collaboration Progress Update
 +
<ul>
 +
<li>Vasiliy Morozov [http://casa.jlab.org/MEIC%20meeting/20170316/2017Mar16_JLEIC_nonlinear.ppt IR / Non-linear studies]</li>
 +
<li>Vasiliy Morozov [http://casa.jlab.org/MEIC%20meeting/20170316/short_report_crab_Morozov_20170316.pptx Crab Crossing / Crab Cavity]</li>
 +
<li>Sullivan, Michael [http://casa.jlab.org/MEIC%20meeting/20170316/IRSRbackgroundUpdate.pptx  IR SR background update]</li>
 +
</ul>
 +
 +
<li>Guohui Wei [http://casa.jlab.org/MEIC%20meeting/20170316/Wei_detector_solenoid_20170316.pptx First Discussion on the Magnet Layout in IR for the Detector Solenoid Compensation]</li>
 +
 +
<li>Yuhong Zhang [http://casa.jlab.org/MEIC%20meeting/20170316/Zhang_luminosity_20170316.pptx JLEIC Luminosity Discussion]</li>
 +
</ul>
 +
 +
 
<ul>
 
<ul>
 
<B>Superferric Dipole and CIC Conductor Topics</B>
 
<B>Superferric Dipole and CIC Conductor Topics</B>

Revision as of 15:14, 17 March 2017


    Superferric Dipole and CIC Conductor Topics
    9:30-9:45 Updates on / confirmation of requirements for Booster and Ion Collider Ring Magnets – 3T and proposed 6T dipoles (aperture, field strength, field quality, ramp rate, others)slides T. Michalski
    9:45-10:30 Status on CIC Conductor Development P. McIntyre
    10:30-11:15 Status and Plans for Building/Testing 3T, Fast Ramp Superferric Model Dipole Cold Mass P. McIntyre
    11:15-12:00 6T Dipole Budgetary Cost Estimate and Superferric Dipole FOA Proposal Discussion P. McIntyre/T. Michalski

    Interaction Region Topics

    1:30-2:00 IR Magnet Requirements slides V. Morozov
    2:00-2:30 IR Magnet Expertise for Collaboration T. Michalski
    2:30-3:00 IR Magnet FOA Proposal Discussion T. Michalski