Difference between revisions of "PITMinutes 05-09-2016"

From CASA Wiki
Jump to: navigation, search
(Agenda and Notes)
(Agenda and Notes)
Line 16: Line 16:
  
 
Vacuum spikes to reliablility (Talk@Staytreat)
 
Vacuum spikes to reliablility (Talk@Staytreat)
 +
 +
Changing machine: stabilization (Bialas and/or Powers)
 +
 +
 +
2. Why have we lost 15-25 MV/linac compared to commissioning period?
 +
 +
How answer question?
 +
 +
Cryomodule compling experiments
 +
More microphonic studies
 +
Valve issues/vacuum trips beam related?
 +
High gradient running expts.
 +
Warm region cleanliness. Either process
 +
or remove and replace.
 +
Check cleanliness of older C20 warm region.
 +
  
  
2. Why have we lost 15-25 MV/module compared to commissioning period?
 
  
  

Revision as of 14:20, 9 May 2016

Attendance

S. Cooper, M. Drury, A. Freyberger, C. Hovater, G. Krafft, F. Marhauser, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, T. Rielly, S. Suhring

Agenda and Notes

1. Operations Status and Summary

OPS Staytreat Focus on reliability

Stonger SRF Compenent Again discussion

Klystron spares gone. Switches to power starved cavities accomplished. Between 2 and 5 MeV energy gain.

Vacuum spikes to reliablility (Talk@Staytreat)

Changing machine: stabilization (Bialas and/or Powers)


2. Why have we lost 15-25 MV/linac compared to commissioning period?

How answer question?

Cryomodule compling experiments More microphonic studies Valve issues/vacuum trips beam related? High gradient running expts. Warm region cleanliness. Either process or remove and replace. Check cleanliness of older C20 warm region.



3. FE/Particulate Meeting Report (Geng)

Follow on activity and future planning


4. Capture degradation rate?

Look at archiver data and compare?

Other ideas?

Action Items