Difference between revisions of "PITMinutes 03-28-2016"

From CASA Wiki
Jump to: navigation, search
Line 8: Line 8:
  
 
LERF Borrowing
 
LERF Borrowing
 +
 +
C50-12 is nominal solution yielding 11.7 GeV
 +
 +
No current plans for repurpose LERF modules
  
 
OPS Staytreat
 
OPS Staytreat

Revision as of 13:35, 28 March 2016

Attendance

R. Bachimanchi, S. Cooper, E. Daly, K. Davis, M. Drury, A. Freyberger, C. Hovater, R. Geng, G. Krafft, C. Mounts, C. Reece, T. Reilly, R. Rimmer, T. Plawski, T. Powers, S. Suhring, H. Zhang

Agenda and Notes

1. Operations Status and Summary

LERF Borrowing

C50-12 is nominal solution yielding 11.7 GeV

No current plans for repurpose LERF modules

OPS Staytreat


2. Heat Measurement Results (Daly)

3. C75 (Marhauser/Rimmer)

4. FE/Particulate Meeting Report (Geng)



Action Items