== Attendance == | == Attendance == | ||
− | R. Bachimanchi | + | R. Bachimanchi, E. Daly, K. Davis, M. Drury, C. Hovater, R. Geng, A. Hutton, A. Kimber, L. King, G. Krafft, F. Marhauser, C. Mounts, C. Reece, T. Reilly, T. Powers, S. Suhring, H. Zhang |
== Agenda and Notes == | == Agenda and Notes == | ||
Line 7: | Line 7: | ||
1. Operations Status and Summary | 1. Operations Status and Summary | ||
− | + | Operations at 12 GeV. | |
− | + | ||
− | + | Beam ops again 28th January. | |
− | + | ||
− | Beam ops 28th January | + | |
Jan 18-28 can RF/cavities operate without beam. | Jan 18-28 can RF/cavities operate without beam. | ||
Line 49: | Line 46: | ||
− | + | 4. Particulate-Free UHV Meeting (Geng) | |
Schedule for February 29 | Schedule for February 29 | ||
Line 62: | Line 59: | ||
== Action Items == | == Action Items == | ||
− | |||
− | |||
Data mining for field emission (Geng) | Data mining for field emission (Geng) | ||
Line 70: | Line 65: | ||
Heat For Project Charter (freyberger) | Heat For Project Charter (freyberger) | ||
− | |||
− |
Latest revision as of 16:15, 4 January 2016
Attendance
R. Bachimanchi, E. Daly, K. Davis, M. Drury, C. Hovater, R. Geng, A. Hutton, A. Kimber, L. King, G. Krafft, F. Marhauser, C. Mounts, C. Reece, T. Reilly, T. Powers, S. Suhring, H. Zhang
Agenda and Notes
1. Operations Status and Summary
Operations at 12 GeV.
Beam ops again 28th January.
Jan 18-28 can RF/cavities operate without beam. Turn on/off infrastructure see microphonic effect.
Daly will compose "He boiling" TP
C100 tests (determine best pressure "defined by highest operating gradient" to operate at)
destinguish/study SEL GDR trip differences (Rama)
2. Results of He Processing (Drury)
3. C75 Project Preliminary Design Review
Project Internal Review: Thursday January 21 (Morning) Responsibility for Program/Agenda?
Cavities (FM) HOM (FM) Cryomodule (ED) Hygiene Plan (GG) Rimmer/Krafft (Specifications) Prototype Data Summary (FM) RF Power (Hovater)
Committee C Reece (chair), Andrew, Cardman)
Goal: Preliminary design review
4. Particulate-Free UHV Meeting (Geng)
Schedule for February 29 Program? Rong-liu will put together an agenda beginning of next year
Action Items
Data mining for field emission (Geng)
C75 parameter table! (krafft, rimmer, marhauser)
Heat For Project Charter (freyberger)