Difference between revisions of "PITMinutes 07-06-2015"
From CASA Wiki
(7 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
== Attendance == | == Attendance == | ||
− | R. Bachimanchi | + | R. Bachimanchi, K. Davis, A. Freyberger, G. Krafft, V. Lagerquist, C. Mounts, T. Plawski, R. Rimmer, T. Powers, H. Wang, H. Zhang |
== Agenda and Notes == | == Agenda and Notes == | ||
1. Operations Status and Summary | 1. Operations Status and Summary | ||
− | + | ||
− | 2. Microphonics Discussion (Plawski) | + | Plasma processing resurrected at SNS. Thinking will be doing whole linac at some point |
− | + | in the future. Maybe think about doing something similar here in future. | |
+ | |||
+ | RF setup period for oncoming ops tentatively Oct 12. End of Sept. to get cryo going. | ||
+ | |||
+ | 2. Microphonics Discussion (Lagerquist,Plawski) | ||
+ | * Lively discussion surrounding talk | ||
+ | * [http://casa.jlab.org/LINACPIT/PIT_Meeting.pdf Microphonics Measurements in R100] | ||
+ | |||
3. Schedule 2015 SRF/Cryo Workshop as part of StayTreat | 3. Schedule 2015 SRF/Cryo Workshop as part of StayTreat | ||
* Final schedule: | * Final schedule: |
Latest revision as of 15:41, 6 July 2015
Attendance
R. Bachimanchi, K. Davis, A. Freyberger, G. Krafft, V. Lagerquist, C. Mounts, T. Plawski, R. Rimmer, T. Powers, H. Wang, H. Zhang
Agenda and Notes
1. Operations Status and Summary
Plasma processing resurrected at SNS. Thinking will be doing whole linac at some point in the future. Maybe think about doing something similar here in future.
RF setup period for oncoming ops tentatively Oct 12. End of Sept. to get cryo going.
2. Microphonics Discussion (Lagerquist,Plawski)
- Lively discussion surrounding talk
- Microphonics Measurements in R100
3. Schedule 2015 SRF/Cryo Workshop as part of StayTreat
- Final schedule:
https://docs.google.com/spreadsheets/d/1FLC6WCH02KcfeHDt-9vLFgqCvh6LyqQn8GomMkUqEkg/pubhtml
Action Items
- Schedule for July 15 Meeting (Freyberger; Krafft)