(Created page with "== Attendance == K. Baggett, J. Benesch, M. Bickley, T. Carlino, G. Ciovati, J. Creel, E. Daly, K. Davis, M. Drury, C. Hovater, N. Huque, F. Humphrey, T. Ganey, C. Ginsburg,...")
 
(Agenda and Notes)
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
== Attendance ==
 
== Attendance ==
  
K. Baggett, J. Benesch, M. Bickley, T. Carlino, G. Ciovati, J. Creel, E. Daly, K. Davis, M. Drury, C. Hovater, N. Huque, F. Humphrey, T. Ganey, C. Ginsburg, J. Kent, A. Kimber, L. King, G. Krafft, F. Marhauser, R. Michaud, C. Mounts, R. Nelson, W. Oren, A. Palczewski., T. Plawski, T. Powers, J. Preble, C. Reece, T. Reilly, A. Seryi, A. Solopova, M. Spata, and P. Vasilauskis
+
K. Baggett, J. Benesch, M. Bickley, T. Carlino, G. Ciovati, J. Creel, E. Daly, K. Davis, M. Drury, C. Hovater, N. Huque, F. Humphrey, T. Ganey, C. Ginsburg, A. Kimber, L. King, G. Krafft, F. Marhauser, R. Michaud, C. Mounts, R. Nelson, W. Oren, A. Palczewski., T. Plawski, T. Powers, J. Preble, C. Reece, T. Reilly, A. Seryi, A. Solopova, M. Spata, and P. Vasilauskis
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==
Line 7: Line 7:
 
1. Operations Status and Summary/Review (Bickley/Drury)
 
1. Operations Status and Summary/Review (Bickley/Drury)
  
Results of 1L25 FE measurements
+
Action items:[1] Continue analysis of two hour pressure spikes
 +
and check module stability after problem solved.
  
[https://casa.jlab.org/LINACPIT/FE_Measurements_at_1L25_071720.pptx Summary of Field Emission Measurements]
+
Pressure spikes solved. Control valve convection heat
 +
leak. Now have the value held open and seems to have
 +
been solution.
  
2. Energy Reach (Mounts)
+
[2] Increase Q_ext to allow higher operating gradient
 +
in 4 cavities
  
RF/SRF issues and current energy reach
+
3 of 4 were adjusted up. CED updated. Fourth could not
 +
be adjusted. Couple MeV increase in linac gradient
  
14 cavities hard off in North linac
+
[3] Turn on 1L08 1, in particular cavity one at
4 cavities hard off in South linac
+
low gradient. Hold field at low set point to avoid
 +
uncontrolled gradient in cavity (cannot be detuned
 +
away from fundamental frequency)
  
Lem to 1031/linac has very high trip rate
+
Cards changed out unstuck the tuner. So now cavity
at moment.
+
can be operated. 6 or so MeV.
  
Non-symmetrical running leads to loss of
+
[4] 0L03-4 stuck tuned. Working on chassis to get
polarization in one of Hall A or Hall C
+
fixed. Tuning card also had an issue, to be replace
 +
next maintenance.
  
3. General discussion
+
[5] Presently  9 cavities in north
 +
and 4 plus module 2L03 in south hard down.
  
Action items:[1] Continue analysis of two hour pressure spikes
+
[6] Heat load down and seems to be under control.
and check module stability after problem solved.
+
 
[2] Increase Q_ext to allow higher operating gradient
+
[7] Lemming to 1031 on both sides and will not have
in 4 cavities
+
to run asymetrically.
[3] Turn on 1L08, in particular cavity three at
+
 
low gradient. Hold field at low set point to avoid
+
 
uncontrolled gradient in cavity (cannot be detuned
+
2. General Discussion (Krafft)
away from fundamental frequency)
+
 
 +
Resume every other week meeting on
 +
RF/SRF issues.
 +
 
 +
Focus on OPS issues near term;
 +
get back to long term focus in
 +
longer term.
 +
 
 +
Charlie's SRF link to description slide.
 +
Marhauser talk link
 +
 
 +
3. Progress on Particle Counter (Geng/Spata)
 +
 
 +
Particle Counter getting closer. Now design
 +
is focusing on "laser blanket" for aperture
 +
design. Detect phase shifts in interferometer
 +
arrangement.
 +
 
 +
July 22 updated solution and updated cost presented
 +
to division leadership. Waiting for favorable
 +
financial decision.
 +
 
 +
Action Item
 +
 
 +
New Ion pump evaluation;

Latest revision as of 14:47, 27 July 2020

Attendance

K. Baggett, J. Benesch, M. Bickley, T. Carlino, G. Ciovati, J. Creel, E. Daly, K. Davis, M. Drury, C. Hovater, N. Huque, F. Humphrey, T. Ganey, C. Ginsburg, A. Kimber, L. King, G. Krafft, F. Marhauser, R. Michaud, C. Mounts, R. Nelson, W. Oren, A. Palczewski., T. Plawski, T. Powers, J. Preble, C. Reece, T. Reilly, A. Seryi, A. Solopova, M. Spata, and P. Vasilauskis

Agenda and Notes

1. Operations Status and Summary/Review (Bickley/Drury)

Action items:[1] Continue analysis of two hour pressure spikes and check module stability after problem solved.

Pressure spikes solved. Control valve convection heat leak. Now have the value held open and seems to have been solution.

[2] Increase Q_ext to allow higher operating gradient in 4 cavities

3 of 4 were adjusted up. CED updated. Fourth could not be adjusted. Couple MeV increase in linac gradient

[3] Turn on 1L08 1, in particular cavity one at low gradient. Hold field at low set point to avoid uncontrolled gradient in cavity (cannot be detuned away from fundamental frequency)

Cards changed out unstuck the tuner. So now cavity can be operated. 6 or so MeV.

[4] 0L03-4 stuck tuned. Working on chassis to get fixed. Tuning card also had an issue, to be replace next maintenance.

[5] Presently 9 cavities in north and 4 plus module 2L03 in south hard down.

[6] Heat load down and seems to be under control.

[7] Lemming to 1031 on both sides and will not have to run asymetrically.


2. General Discussion (Krafft)

Resume every other week meeting on RF/SRF issues.

Focus on OPS issues near term; get back to long term focus in longer term.

Charlie's SRF link to description slide.

Marhauser talk link

3. Progress on Particle Counter (Geng/Spata)

Particle Counter getting closer. Now design is focusing on "laser blanket" for aperture design. Detect phase shifts in interferometer arrangement.

July 22 updated solution and updated cost presented to division leadership. Waiting for favorable financial decision.

Action Item

New Ion pump evaluation;