Difference between revisions of "PITMinutes 10-07-2019"

From CASA Wiki
Jump to: navigation, search
(Attendance)
(Agenda and Notes)
 
(10 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
== Attendance ==
 
== Attendance ==
  
M. Aiken, R. Bachimanchi, K. Baggett, J. Benesch, E. Daly, M. Drury, B. Freeman, C. Hovater, C. Ginsburg, A. Kimber, G. Krafft, C. Mounts, R. Nelson, T. Plawski, T. Powers, Y. Roblin, M. Spata, A. Solopova, and S. Suhring.
+
M. Aiken, R. Bachimanchi, K. Baggett, J. Benesch, E. Daly, M. Drury, B. Freeman, C. Hovater, J. Grames, C. Ginsburg, A. Kimber, G. Krafft, R. Michaud, C. Mounts, R. Nelson, T. Plawski, T. Powers, Y. Roblin, M. Spata, A. Solopova, S. Suhring, M. Tiefenback,
 +
and P. Vasilauskis.
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==
Line 20: Line 21:
 
[https://casa.jlab.org/LINACPIT/RB-B_PitPresentation.pdf Hall B Run Requirements (Tiefenback)]
 
[https://casa.jlab.org/LINACPIT/RB-B_PitPresentation.pdf Hall B Run Requirements (Tiefenback)]
  
[https://casa.jlab.org/LINACPIT/HallC_FY20_reqs_tiefen.pdf Hall B Run Requirements (Tiefenback)]
+
[https://casa.jlab.org/LINACPIT/beam_parameters_rg-b.pdf Document on Hall B Run Requirements (Tiefenback)]
  
 
[https://casa.jlab.org/LINACPIT/HallC_FY20_reqs_benesch.pdf Hall C Run Requirements (Benesch)]
 
[https://casa.jlab.org/LINACPIT/HallC_FY20_reqs_benesch.pdf Hall C Run Requirements (Benesch)]
Line 32: Line 33:
 
distribution. Two hours up to several days to correct.
 
distribution. Two hours up to several days to correct.
 
can pre-prepare matches. 10.6 GeV needed to get beyond a physics
 
can pre-prepare matches. 10.6 GeV needed to get beyond a physics
threshold. 10.5 not good enough. energy in slide. Target faults
+
threshold. 10.5 not good enough. energy in slide. Target faults.
 +
Slides from all Halls.
  
  
Line 50: Line 52:
 
[https://casa.jlab.org/LINACPIT/fall_polariz_options.pdf Fall Polarization Options (Benesch)]
 
[https://casa.jlab.org/LINACPIT/fall_polariz_options.pdf Fall Polarization Options (Benesch)]
  
[https://casa.jlab.org/LINACPIT/turnon_gradient_choice.pdf Fall Turnon Gradient Choice (Benesch)]
+
[https://casa.jlab.org/LINACPIT/turnon_gradient_choice_rev2.pdf Fall Turnon Gradient Choice (Benesch)]
  
 
2:05      Present Gradient Limitations    (Drury)
 
2:05      Present Gradient Limitations    (Drury)
Line 64: Line 66:
  
 
2:40      Energy Reach  (Baggett)
 
2:40      Energy Reach  (Baggett)
 +
 +
[https://casa.jlab.org/LINACPIT/Energy_Reach_Fall_2019.pptx Energy Reach Fall 2019 (Baggett)]
  
 
Comments:
 
Comments:
Line 70: Line 74:
 
2:50      CEBAF Performance Plan                      (Michaud)
 
2:50      CEBAF Performance Plan                      (Michaud)
  
[https://casa.jlab.org/LINACPIT/PIT_Meeting.pdf Gradient Change Instruction for OPS (Michaud)]
+
[https://casa.jlab.org/LINACPIT/PIT_Meeting.pdf CEBAF Performance Plan (Michaud)]
  
 
Comments:
 
Comments:

Latest revision as of 08:20, 8 October 2019

Attendance

M. Aiken, R. Bachimanchi, K. Baggett, J. Benesch, E. Daly, M. Drury, B. Freeman, C. Hovater, J. Grames, C. Ginsburg, A. Kimber, G. Krafft, R. Michaud, C. Mounts, R. Nelson, T. Plawski, T. Powers, Y. Roblin, M. Spata, A. Solopova, S. Suhring, M. Tiefenback, and P. Vasilauskis.

Agenda and Notes

1. Extended PIT Meeting (Resumption of Operations)

1:00 Goal for Meeting (Ginsburg)

Goal for Meeting

Comments:


1:10 Experiment Requirements and Desires for next running periods (HALL APLs, Grames)

Posted Fall Running (Grames)

Hall B Run Requirements (Tiefenback)

Document on Hall B Run Requirements (Tiefenback)

Hall C Run Requirements (Benesch)

Comments: Test early at 300 muA will bge tried. A High current (150 muA) 1 pass running. Not too much stress! 30 muA to C is a target max. A could run at lower energy with benefit. High current parity quality. trip interaction with target not bad. Question, stability of the match into hal depends on the gradient distribution. Two hours up to several days to correct. can pre-prepare matches. 10.6 GeV needed to get beyond a physics threshold. 10.5 not good enough. energy in slide. Target faults. Slides from all Halls.



1:25 Performance Expectations in Relocated Modules (Drury)

Expected Performance After CM Swaps (Drury)

1:50 RF Configuration after SAD (Hovater)

Comments:


1:55 Gradient Choice at Turnon (Benesch)

Fall Polarization Options (Benesch)

Fall Turnon Gradient Choice (Benesch)

2:05 Present Gradient Limitations (Drury)

Data from Commissioning (Drury)

2:25 Gradient Change Instructions for OPS (Solopova)

Gradient Change Instruction for OPS (Solopova)

Comments:


2:40 Energy Reach (Baggett)

Energy Reach Fall 2019 (Baggett)

Comments:


2:50 CEBAF Performance Plan (Michaud)

CEBAF Performance Plan (Michaud)

Comments: