Difference between revisions of "PITMinutes 08-12-2019"

From CASA Wiki
Jump to: navigation, search
(Agenda and Notes)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 
== Attendance ==
 
== Attendance ==
  
R. Bachimanchi, K. Baggett, G. Ciovati, H. Fanning, C. Hovater, G. Krafft, A. Kimber, K. Macha, Ju. Musson, J. Musson, T. Plawski, T. Powers, R. Rimmer, and C. Reece.
+
K. Baggett, C. Hovater, R. Geng, A. Hutton, G. Krafft, A. Kimber, K. Macha, C. Mounts, R. Nelson, T. Plawski, T. Powers, R. Rimmer, C. Reece, A. Seryi, and H. Wang.
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==
Line 7: Line 7:
 
1. Operations Status and Summary/Review (Bickley)
 
1. Operations Status and Summary/Review (Bickley)
  
Physics run extended so less time for shutdown.
+
Physics run extended and two weeks added to shutdown.
 
Good reliability running at low energy.
 
Good reliability running at low energy.
Re-planned summer maintenance work. Rebuilt C100
+
Re-planned summer maintenance work. Full E' plan
will go in but swap to NL07 will be put on hold.
+
will be executed.
 
Low energy setup with reduced heating accomplished.
 
Low energy setup with reduced heating accomplished.
  
Line 17: Line 17:
 
2. In Situ Q_L Measurements (Marhauser)
 
2. In Situ Q_L Measurements (Marhauser)
  
[https://casa.jlab.org/LINACPIT/JuMussonPresentation.pptx Presentation on Q_L Measurement]
+
[https://casa.jlab.org/LINACPIT/MarhauserAugust122019.pptx Presentation on Q_L Measurement]
  
 
3. Some Comments on particulates (Geng)
 
3. Some Comments on particulates (Geng)

Latest revision as of 14:32, 12 August 2019

Attendance

K. Baggett, C. Hovater, R. Geng, A. Hutton, G. Krafft, A. Kimber, K. Macha, C. Mounts, R. Nelson, T. Plawski, T. Powers, R. Rimmer, C. Reece, A. Seryi, and H. Wang.

Agenda and Notes

1. Operations Status and Summary/Review (Bickley)

Physics run extended and two weeks added to shutdown. Good reliability running at low energy. Re-planned summer maintenance work. Full E' plan will be executed. Low energy setup with reduced heating accomplished.

Plan for module swaps complete.

2. In Situ Q_L Measurements (Marhauser)

Presentation on Q_L Measurement

3. Some Comments on particulates (Geng)

Many valve closure tests completed and log entries made. Particulates ranging in size from sub-micron to several microns are observed in the tests.

Action Items

Leadership of quenches. Offline discussion.

C100 Refurbishment Project for the future?