Difference between revisions of "PITMinutes 07-15-2019"

From CASA Wiki
Jump to: navigation, search
(Attendance)
(Attendance)
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
== Attendance ==
 
== Attendance ==
  
R. Bachimanchi, K. Baggett, P. Degtiarenko, H. Fanning, C. Hovater, G. Krafft, A. Kimber, Ju. Musson, T. Plawski, T. Powers, R. Rimmer, C. Reece, T. Rielly, R. Rimmer, A. Seryi, and S. Suhring.
+
R. Bachimanchi, K. Baggett, G. Ciovati, H. Fanning, C. Hovater, G. Krafft, A. Kimber, K. Macha, Ju. Musson, J. Musson, T. Plawski, T. Powers, R. Rimmer, and C. Reece.
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==
Line 11: Line 11:
 
related. Lots of difficulties with machine reproducibility,
 
related. Lots of difficulties with machine reproducibility,
 
optics, etc., although some problems with separators.
 
optics, etc., although some problems with separators.
Seem to be moving now.
+
Seem to be moving now. 1L06 energy drain from bad control
 +
card had been limiting the current. Current limit possibly gone now.
 +
 
 +
Plan for module swaps complete.
  
 
2. Data Extraction LLRF (Julia Musson)
 
2. Data Extraction LLRF (Julia Musson)

Latest revision as of 14:47, 15 July 2019

Attendance

R. Bachimanchi, K. Baggett, G. Ciovati, H. Fanning, C. Hovater, G. Krafft, A. Kimber, K. Macha, Ju. Musson, J. Musson, T. Plawski, T. Powers, R. Rimmer, and C. Reece.

Agenda and Notes

1. Operations Status and Summary/Review (Bickley)

Low energy setup with reduced heating accomplished. Though overall month for ops but not so much SRF/RF related. Lots of difficulties with machine reproducibility, optics, etc., although some problems with separators. Seem to be moving now. 1L06 energy drain from bad control card had been limiting the current. Current limit possibly gone now.

Plan for module swaps complete.

2. Data Extraction LLRF (Julia Musson)

Data Extraction Presentation

3. Some Comments on particulates (Geng)

4. Plasma Processing (Powers)

Plasma Processing Status

Action Items

Leadership of quenches. Offline discussion.

C100 Refurbishment Project for the future?