Difference between revisions of "PITMinutes 12-04-2017"

From CASA Wiki
Jump to: navigation, search
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
== Attendance ==
 
== Attendance ==
  
R. Bachimanchi, K. Baggett, G. Ciovati, M. Drury, C. Hovater, A. Freyberger, R. Geng, G. Krafft, A. Kimber, R. Legg, F. Marhauser, C. Mounts, T. Plawski, C. Reece, and H. Wang.
+
R. Bachimanchi, K. Baggett, J. Benesch, G. Ciovati, C. Hovater, A. Freyberger, R. Geng, G. Krafft, A. Kimber, F. Marhauser, C. Mounts, T. Plawski, C. Reece, R. Rimmer, D. Seidman, and H. Wang.
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==
Line 15: Line 15:
 
document. We are gathered here to: "Speak Now, or forever hold your peace!"
 
document. We are gathered here to: "Speak Now, or forever hold your peace!"
  
[https://casa.jlab.org/LINACPIT/2017-11-22_Draft_2.0.pdf JLAB-TN-17-055: Draft C75 Specification Document]
+
[https://casa.jlab.org/LINACPIT/2017-11-22_Draft_3.0.pdf JLAB-TN-17-055: Draft C75 Specification Document]
  
3. Draft Cryomodule Specification (Benesch)
+
3. C75 LLRF (Hovater)
 +
 
 +
[https://casa.jlab.org/LINACPIT/C75_LLRF_Strategy.pptx Presentation on C75 LLRF]
 +
 
 +
4. Draft Cryomodule Specification (Benesch)
  
 
Jay has written up a set of goals for the cryomodules:
 
Jay has written up a set of goals for the cryomodules:
 
[https://casa.jlab.org/LINACPIT/2017CM_specR2.pdf Draft Cryomodule Specification]
 
[https://casa.jlab.org/LINACPIT/2017CM_specR2.pdf Draft Cryomodule Specification]
  
4. Draft Acceptance Criteria (Legg)
+
5. Draft Acceptance Criteria (Legg)
  
 
Bob shared the LCLS II module acceptance criteria that the
 
Bob shared the LCLS II module acceptance criteria that the
Line 37: Line 41:
 
Leadership of quenches. Offline discussion.
 
Leadership of quenches. Offline discussion.
  
Complete C75 Module Specifications (Marhauser, Krafft)
+
Complete C75 Module Specifications (Marhauser, Benesch, Krafft)
  
 
C100 Refurbishment Project for the future?
 
C100 Refurbishment Project for the future?

Latest revision as of 16:02, 4 December 2017

Attendance

R. Bachimanchi, K. Baggett, J. Benesch, G. Ciovati, C. Hovater, A. Freyberger, R. Geng, G. Krafft, A. Kimber, F. Marhauser, C. Mounts, T. Plawski, C. Reece, R. Rimmer, D. Seidman, and H. Wang.

Agenda and Notes

1. Operations Status and Summary (Freyberger)

Beam On! Physics starting. SRF systems detected, by tripping, the 5.1 Richter earthquake centerred in Dover, DE.

2. C75 Cavity Performance Specifications Signoff (Krafft, Hovater, Freyberger)

Frank and Gigi (mainly) have written up a C75 performance specification document. We are gathered here to: "Speak Now, or forever hold your peace!"

JLAB-TN-17-055: Draft C75 Specification Document

3. C75 LLRF (Hovater)

Presentation on C75 LLRF

4. Draft Cryomodule Specification (Benesch)

Jay has written up a set of goals for the cryomodules: Draft Cryomodule Specification

5. Draft Acceptance Criteria (Legg)

Bob shared the LCLS II module acceptance criteria that the LCLS II project is working under. We should perhaps adopt something similar for C75? (Discuss Pros and Cons)

LCLS II Module Acceptance Criteria



Action Items

Leadership of quenches. Offline discussion.

Complete C75 Module Specifications (Marhauser, Benesch, Krafft)

C100 Refurbishment Project for the future?