R. Bachimanchi, K. Baggett, G. Ciovati, M. Drury, C. Hovater, A. Freyberger, R. Geng, G. Krafft, A. Kimber, R. Legg, F. Marhauser, C. Mounts, T. Plawski, C. Reece, and H. Wang.
+
R. Bachimanchi, K. Baggett, J. Benesch, G. Ciovati, C. Hovater, A. Freyberger, R. Geng, G. Krafft, A. Kimber, F. Marhauser, C. Mounts, T. Plawski, C. Reece, R. Rimmer, D. Seidman, and H. Wang.
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==
Line 7: Line 7:
 
1. Operations Status and Summary (Freyberger)
 
1. Operations Status and Summary (Freyberger)
  
Beam On! Physics starting. SRF systems detected, by tripping, the earthquake
+
Beam On! Physics starting. SRF systems detected, by tripping, the 5.1 Richter earthquake
 
centerred in Dover, DE.
 
centerred in Dover, DE.
  
 
2. C75 Cavity Performance Specifications Signoff (Krafft, Hovater, Freyberger)
 
2. C75 Cavity Performance Specifications Signoff (Krafft, Hovater, Freyberger)
  
Freyberger updated on the status of the performance plan (approved!)
+
Frank and Gigi (mainly) have written up a C75 performance specification
Need to have some agreed upon specs for project.
+
document. We are gathered here to: "Speak Now, or forever hold your peace!"
F. Marhauser has made a start. When document blessed, we'll send
+
it around. Table from Arne's AAC talk.
+
  
Spec Signoff Monday Morning after Thanksgiving.
+
[https://casa.jlab.org/LINACPIT/2017-11-22_Draft_3.0.pdf JLAB-TN-17-055: Draft C75 Specification Document]
Spoke posted here
+
Requirement 70 MeV with beam for 1 module 460 muA.
+
19.07 @ 8e9 Q-0
+
  
 +
3. C75 LLRF (Hovater)
  
[https://casa.jlab.org/LINACPIT/C75_table.pptx C75 Draft Specifications]
+
[https://casa.jlab.org/LINACPIT/C75_LLRF_Strategy.pptx Presentation on C75 LLRF]
  
[https://casa.jlab.org/LINACPIT/2017-11-22_Draft_2.0.pdf JLAB-TN-17-055: Draft C75 Specification Document]
+
4. Draft Cryomodule Specification (Benesch)
 
+
2. Draft Cryomodule Specification (Benesch)
+
  
 
Jay has written up a set of goals for the cryomodules:
 
Jay has written up a set of goals for the cryomodules:
 
[https://casa.jlab.org/LINACPIT/2017CM_specR2.pdf Draft Cryomodule Specification]
 
[https://casa.jlab.org/LINACPIT/2017CM_specR2.pdf Draft Cryomodule Specification]
  
3. Draft Acceptance Criteria (Legg)
+
5. Draft Acceptance Criteria (Legg)
 +
 
 
Bob shared the LCLS II module acceptance criteria that the
 
Bob shared the LCLS II module acceptance criteria that the
 
LCLS II project is working under. We should perhaps adopt something
 
LCLS II project is working under. We should perhaps adopt something
Line 46: Line 41:
 
Leadership of quenches. Offline discussion.
 
Leadership of quenches. Offline discussion.
  
Complete C75 Module Specifications (Marhauser, Krafft)
+
Complete C75 Module Specifications (Marhauser, Benesch, Krafft)
  
 
C100 Refurbishment Project for the future?
 
C100 Refurbishment Project for the future?

Latest revision as of 16:02, 4 December 2017

Attendance

R. Bachimanchi, K. Baggett, J. Benesch, G. Ciovati, C. Hovater, A. Freyberger, R. Geng, G. Krafft, A. Kimber, F. Marhauser, C. Mounts, T. Plawski, C. Reece, R. Rimmer, D. Seidman, and H. Wang.

Agenda and Notes

1. Operations Status and Summary (Freyberger)

Beam On! Physics starting. SRF systems detected, by tripping, the 5.1 Richter earthquake centerred in Dover, DE.

2. C75 Cavity Performance Specifications Signoff (Krafft, Hovater, Freyberger)

Frank and Gigi (mainly) have written up a C75 performance specification document. We are gathered here to: "Speak Now, or forever hold your peace!"

JLAB-TN-17-055: Draft C75 Specification Document

3. C75 LLRF (Hovater)

Presentation on C75 LLRF

4. Draft Cryomodule Specification (Benesch)

Jay has written up a set of goals for the cryomodules: Draft Cryomodule Specification

5. Draft Acceptance Criteria (Legg)

Bob shared the LCLS II module acceptance criteria that the LCLS II project is working under. We should perhaps adopt something similar for C75? (Discuss Pros and Cons)

LCLS II Module Acceptance Criteria



Action Items

Leadership of quenches. Offline discussion.

Complete C75 Module Specifications (Marhauser, Benesch, Krafft)

C100 Refurbishment Project for the future?