Difference between revisions of "PITMinutes 09-26-2016"

From CASA Wiki
Jump to: navigation, search
(New page: == Attendance == R. Bachimanchi, G. Ciovati, A. Freyberger, C. Hovater, G. Krafft, A. Kimber, C. Mounts, R. Nelson, T. Powers, T. Reilly, C. Reece, B. Rimmer == Agenda and Notes == 1. O...)
 
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
== Attendance ==
 
== Attendance ==
  
R. Bachimanchi, G. Ciovati, A. Freyberger, C. Hovater, G. Krafft, A. Kimber, C. Mounts, R. Nelson, T. Powers, T. Reilly, C. Reece, B. Rimmer
+
G. Krafft, A. Kimber, R. Legg, F. Marhauser, R. Geng, C. Reece, H. Zhang
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==
Line 7: Line 7:
 
1. Operations Status and Summary
 
1. Operations Status and Summary
  
C50-12 installed. Testing tonight Commissioning and
+
Field emission and radiation measurements continue.
checkout ???.
+
  
microphonics??? Tuner dampers tested Thursday:
+
C100 He processing.
cavities 1 6 7 8 have been damped others still show
+
fluctuations. Tested again tonight.
+
  
Field Emission and Radiation Measurements.
+
2. Gradient Team  (Bob Legg)
accumulation downstream. Cavity-cavity and module to module.
+
  
Q vs. E on the NL12. Good idea to continue!
+
First Pass at closeout document.
  
C100 He processing. NL23 improvments on field emitters.  6 FE
+
Process to close out with stakeholders started
cavities processed. Continuing.
+
  
3. C75 Mock-up Results (Gigi/Bob)
+
Effort coordination returns to PIT (return to pre-team situation)
  
First look at data
+
[https://casa.jlab.org/LINACPIT/PIT_CloseOut_Talk.pptx Gradient Team Draft Closeout]
  
4. Follow up Field emission Workshop (Geng)
+
3. Field Emitters Movement (Geng/Zhang)
  
Indigo Site available
+
Meeting with Spata, He Zhang, Krafft, Geng, Roblin,
The indico web site for the followup meeting is
+
and Freyberger scheduled for initial go-through on
 +
Field Emitter movement, and modelling. First meeting
 +
after this one.
  
https://www.jlab.org/indico/event/173/
+
4. General Discussion on Future Directions/Focus (Krafft)
  
Rongli
+
5. Regular reporting; perhaps Josh in two weeks.
 
+
 
+
5. LLRF Firmware Recs Summary (Rama)
+
 
+
[https://casa.jlab.org/LINACPIT/LLRF_Firmware_Recs_Status_8_29_16.pptx LLRF FIrmware Recommendations]
+
 
+
6. Regular Reporting
+
  
 
[https://casa.jlab.org/LINACPIT/Girder_Particulate_Summary2016-08-15b.pptx Girder Particulate Summary]
 
[https://casa.jlab.org/LINACPIT/Girder_Particulate_Summary2016-08-15b.pptx Girder Particulate Summary]
  
 
== Action Items ==
 
== Action Items ==

Latest revision as of 07:35, 28 September 2016

Attendance

G. Krafft, A. Kimber, R. Legg, F. Marhauser, R. Geng, C. Reece, H. Zhang

Agenda and Notes

1. Operations Status and Summary

Field emission and radiation measurements continue.

C100 He processing.

2. Gradient Team (Bob Legg)

First Pass at closeout document.

Process to close out with stakeholders started

Effort coordination returns to PIT (return to pre-team situation)

Gradient Team Draft Closeout

3. Field Emitters Movement (Geng/Zhang)

Meeting with Spata, He Zhang, Krafft, Geng, Roblin, and Freyberger scheduled for initial go-through on Field Emitter movement, and modelling. First meeting after this one.

4. General Discussion on Future Directions/Focus (Krafft)

5. Regular reporting; perhaps Josh in two weeks.

Girder Particulate Summary

Action Items