R. Bachimanchi, M. Drury, R. Geng, C. Hovater, A. Hutton, G. Krafft, A. Kimber, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, T. Reilly, R. Rimmer
+
R. Bachimanchi, E. Daly, K. Davis, C. Hovater, A. Hutton, G. Krafft, A. Kimber, C. Mounts, R. Nelson, T. Plawski, T. Powers, T. Reilly, C. Reece, H. Wang
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==
Line 7: Line 7:
 
1. Operations Status and Summary
 
1. Operations Status and Summary
  
Enhanced Radiation monitoring in 1L26
+
Enhanced Radiation monitoring in 1L26 (e-log benesch)
 +
systematic measurements started
 +
 
 +
 
 +
 
 +
[https://casa.jlab.org/LINACPIT/2L24_Strike36_40Hz.wmv Powers Strike Movie of Module Oscillation]
 +
 
 +
Is there benefit from some kind of 40 Hz
 +
thumper measurment?
  
  
 
2. C50-12 Warm Girder Studies
 
2. C50-12 Warm Girder Studies
 +
 +
Collected 60 samples from inside warm girders.
 +
 +
Secured and will be analyzed in two stages:
 +
gross and fine, regarding size and elements present
 +
 +
NL-12 cryomodule lift out tomorrow and will
 +
be delivered to SRF Inst.
  
  
 
3. C75 (Gigi/Bob Report Next Week)
 
3. C75 (Gigi/Bob Report Next Week)
  
Complete Efforts for 2 prototypes.
+
Mock-up to be tested this week.
 +
 
 +
First look
 +
at HOM Qs and Q0 vs. E
  
C75 or C50 next year?
+
C75 or C50 next year? Brief discussion. As not
 +
approved by Mont, looks like need to wait till
 +
13th refurbished module. Need to still complete
 +
data gathering for future C75
  
 
4. Follow up Field emission Workshop (Geng)
 
4. Follow up Field emission Workshop (Geng)
Line 25: Line 47:
 
This room.
 
This room.
  
 +
Preliminay agenda
  
[https://casa.jlab.org/html/LINACPIT/Six_month_Follow_25jul16.docx Tentative Agenda]
+
[https://casa.jlab.org/LINACPIT/Six_Month_Follow_25jul16.docx Tentative Agenda]
  
 
== Action Items ==
 
== Action Items ==

Latest revision as of 09:14, 2 August 2016

Attendance

R. Bachimanchi, E. Daly, K. Davis, C. Hovater, A. Hutton, G. Krafft, A. Kimber, C. Mounts, R. Nelson, T. Plawski, T. Powers, T. Reilly, C. Reece, H. Wang

Agenda and Notes

1. Operations Status and Summary

Enhanced Radiation monitoring in 1L26 (e-log benesch) systematic measurements started


Powers Strike Movie of Module Oscillation

Is there benefit from some kind of 40 Hz thumper measurment?


2. C50-12 Warm Girder Studies

Collected 60 samples from inside warm girders.

Secured and will be analyzed in two stages: gross and fine, regarding size and elements present

NL-12 cryomodule lift out tomorrow and will be delivered to SRF Inst.


3. C75 (Gigi/Bob Report Next Week)

Mock-up to be tested this week.

First look at HOM Qs and Q0 vs. E

C75 or C50 next year? Brief discussion. As not approved by Mont, looks like need to wait till 13th refurbished module. Need to still complete data gathering for future C75

4. Follow up Field emission Workshop (Geng)

Tentative Date September 12. Whole afternoon Subscribed. This room.

Preliminay agenda

Tentative Agenda