== Attendance ==
 
== Attendance ==
  
S. Cooper, M. Drury, A. Freyberger, R. Geng, C. Hovater, A. Hutton, G. Krafft, A. Kimber, C. Mounts, R. Nelson, T. Powers, C. Reece, T. Reilly, R. Rimmer, S. Suhring
+
R. Bachimanchi, M. Drury, R. Geng, C. Hovater, A. Hutton, G. Krafft, A. Kimber, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, T. Reilly, R. Rimmer
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==
Line 7: Line 7:
 
1. Operations Status and Summary
 
1. Operations Status and Summary
  
heater testing in R100
+
Microphonic damping feet on 0L04
  
microphonic damping feet on 0L04:
+
Correlation studies: systematically torque feet and measure microphonics.
didn't fit keep trying new feet problems also.
+
 
 +
Microphonic stabilization equipment installed on SL-24.
 +
 
 +
Kirk Davis and Tom taking before and after data.
 +
 
 +
Idea to modify connections and check mode frequencies.
 +
Minimize transfer of microphonics into cavities.
 +
Also installed tuner damper to damp MP .
 +
 
 +
Tuner damper rings in FEL04 also.
 +
 
 +
Controls improvements to improve recovery times implemented. Better diagnostics
 +
Periodic trips being observed again. Snooping around for sources.
 +
 
 +
RF Software improvement? Capture trips and reduce interactions tuners and MP they generate.
 +
 
 +
There might be benefit by raising press in SL by 3-4 mbar.
  
 
2. C50-12 Warm Girder Study Plan
 
2. C50-12 Warm Girder Study Plan
  
Added valve update and replacement to allow work,
+
Both girders out, module next few days.
Warm regions will be pulled and looked at and processed
+
in SRF institute.
+
Studies of warm girders next to the removed 1L12 cryomodule.
+
Cryogenic planning for C50-12 discussed at 2:30.
+
May have to warm up NL10 and NL14 also.
+
Talk through cycling of internal valves from contamination
+
point of view.
+
  
Clean interior of both sides.
+
Sampling plan for girders: about 20 different points.
 +
 
 +
Samples will be also taken before/after gate valves replaced.
 +
 
 +
No visible dirt in beam pipe but dust has been observed.
 +
 
 +
Warm valve problems and failures: due to radiation?
 +
 
 +
Added valve update and replacement to work.
  
 
3. C75 on hold (Gigi Report)
 
3. C75 on hold (Gigi Report)
 +
 +
Complete Efforts for 2 prototypes. After report will chart
 +
a course forward.
 +
 +
2-3 weeks to complete mockup. 3.5 times 10^7 for Q_L
 +
 +
Several HOM loads located and low loss window located.
 +
 +
Magnetic shielding and hygeine produced good result at cavity locations in CM.
 +
 +
C75 or C50 next year? Waiting test results to decide.
  
 
4. Effects of desorbed gas on FE (Geng)
 
4. Effects of desorbed gas on FE (Geng)
  
[https://casa.jlab.org/html/LINACPIT/C100_Moduledsweb/Get/Document-117729/16-008.pdf Field Emission/ Talk]
+
Desorbed gas report coming.
 +
 
 +
Covering of miniconflat by simple Al foil will not
 +
be good enough going forward. Particles can still get around.
 +
 
 +
Joint goal is to have final written procedure leading to low
 +
particulate movements.
 +
 
 +
NeG pump looking good. Will probably use in warm region.

Latest revision as of 09:13, 1 August 2016

Attendance

R. Bachimanchi, M. Drury, R. Geng, C. Hovater, A. Hutton, G. Krafft, A. Kimber, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, T. Reilly, R. Rimmer

Agenda and Notes

1. Operations Status and Summary

Microphonic damping feet on 0L04

Correlation studies: systematically torque feet and measure microphonics.

Microphonic stabilization equipment installed on SL-24.

Kirk Davis and Tom taking before and after data.

Idea to modify connections and check mode frequencies. Minimize transfer of microphonics into cavities. Also installed tuner damper to damp MP .

Tuner damper rings in FEL04 also.

Controls improvements to improve recovery times implemented. Better diagnostics Periodic trips being observed again. Snooping around for sources.

RF Software improvement? Capture trips and reduce interactions tuners and MP they generate.

There might be benefit by raising press in SL by 3-4 mbar.

2. C50-12 Warm Girder Study Plan

Both girders out, module next few days.

Sampling plan for girders: about 20 different points.

Samples will be also taken before/after gate valves replaced.

No visible dirt in beam pipe but dust has been observed.

Warm valve problems and failures: due to radiation?

Added valve update and replacement to work.

3. C75 on hold (Gigi Report)

Complete Efforts for 2 prototypes. After report will chart a course forward.

2-3 weeks to complete mockup. 3.5 times 10^7 for Q_L

Several HOM loads located and low loss window located.

Magnetic shielding and hygeine produced good result at cavity locations in CM.

C75 or C50 next year? Waiting test results to decide.

4. Effects of desorbed gas on FE (Geng)

Desorbed gas report coming.

Covering of miniconflat by simple Al foil will not be good enough going forward. Particles can still get around.

Joint goal is to have final written procedure leading to low particulate movements.

NeG pump looking good. Will probably use in warm region.