== Attendance ==
 
== Attendance ==
  
R. Bachimanchi, M. Drury, A. Freyberger, C. Hovater, A. Hutton, G. Krafft, A. Kimber, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece
+
S. Cooper, M. Drury, A. Freyberger, R. Geng, C. Hovater, A. Hutton, G. Krafft, A. Kimber, R. Nelson, T. Powers, C. Reece, T. Reilly, R. Rimmer, S. Suhring
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==
Line 10: Line 10:
  
 
microphonic damping feet on 0L04:
 
microphonic damping feet on 0L04:
didn't fit keep trying  
+
didn't fit keep trying new feet problems also.
 +
 
  
  
Line 21: Line 22:
 
3. C50-12 Warm Girder Study Plan (Freyberg)
 
3. C50-12 Warm Girder Study Plan (Freyberg)
  
 +
Added valve update and replacement to allow work,
 +
Warm regions will be pulled and looked at and processed
 +
in SRF institute.
 
Studies of warm girders next to the removed 1L12 cryomodule.
 
Studies of warm girders next to the removed 1L12 cryomodule.
 +
Cryogenic planning for C50-12 discussed at 2:30.
 +
May have to warm up NL10 and NL14 also.
 +
Talk through cycling of internal valves from contamination
 +
point of view.
  
 
Clean interior of both sides.
 
Clean interior of both sides.
 +
 +
4. Effects of desorbed gas on FE (Geng)
 +
 +
[https://casa.jlab.org/LINACPIT/C100_module_warmup_RGA_monitoring_May2016.pdf Desorbed Gas Study]
 +
 +
 +
  
 
== Action Items ==
 
== Action Items ==

Latest revision as of 10:44, 1 August 2016

Attendance

S. Cooper, M. Drury, A. Freyberger, R. Geng, C. Hovater, A. Hutton, G. Krafft, A. Kimber, R. Nelson, T. Powers, C. Reece, T. Reilly, R. Rimmer, S. Suhring

Agenda and Notes

1. Operations Status and Summary

heater testing in R100

microphonic damping feet on 0L04: didn't fit keep trying new feet problems also.


2. Stay-treat program (Implications for PIT) (Freyberg)

Ops 2016 StayTreat Agenda https://docs.google.com/spreadsheets/d/1mZAcT4FgPV9hIcK2XVacM2uR5s5q-DNBpqV-Di3xa74/edit#gid=591661138


3. C50-12 Warm Girder Study Plan (Freyberg)

Added valve update and replacement to allow work, Warm regions will be pulled and looked at and processed in SRF institute. Studies of warm girders next to the removed 1L12 cryomodule. Cryogenic planning for C50-12 discussed at 2:30. May have to warm up NL10 and NL14 also. Talk through cycling of internal valves from contamination point of view.

Clean interior of both sides.

4. Effects of desorbed gas on FE (Geng)

Desorbed Gas Study



Action Items