Focus on reliability
 
Focus on reliability
  
Stonger SRF Compenent Again discussion
+
Stronger SRF Compenent Again discussion
  
 
Klystron spares gone. Switches to power starved cavities
 
Klystron spares gone. Switches to power starved cavities
 
accomplished. Between 2 and 5 MeV energy gain.
 
accomplished. Between 2 and 5 MeV energy gain.
  
Vacuum spikes to reliablility (Talk@Staytreat)
+
Vacuum spikes contributions to reliablility (Talk@Staytreat)
  
 
Changing machine: stabilization (Bialas and/or Powers)
 
Changing machine: stabilization (Bialas and/or Powers)
 
  
 
2. Why have we lost 15-25 MV/linac compared to commissioning period?
 
2. Why have we lost 15-25 MV/linac compared to commissioning period?
Line 24: Line 23:
 
How answer question?
 
How answer question?
  
Cryomodule compling experiments
+
Cryomodule coupling experiments
 +
 
 
More microphonic studies
 
More microphonic studies
 +
 
Valve issues/vacuum trips beam related?
 
Valve issues/vacuum trips beam related?
High gradient running expts.
+
 
 +
High gradient running experiments during downs.
 +
 
 
Warm region cleanliness. Either process
 
Warm region cleanliness. Either process
 
or remove and replace.
 
or remove and replace.
Check cleanliness of older C20 warm region.
 
 
 
 
  
 +
Check cleanliness of older C20 warm region.
  
 
3. FE/Particulate Meeting Report (Geng)
 
3. FE/Particulate Meeting Report (Geng)

Latest revision as of 13:15, 23 May 2016

Attendance

R. Bachimanchi., S. Cooper, K. Davis, M. Drury, A. Freyberger, C. Hovater, G. Krafft, F. Marhauser, C. Mounts, R. Nelson, T. Plawski, C. Reece, T. Reilly, S. Suhring

Agenda and Notes

1. Operations Status and Summary

OPS Staytreat Focus on reliability

Stronger SRF Compenent Again discussion

Klystron spares gone. Switches to power starved cavities accomplished. Between 2 and 5 MeV energy gain.

Vacuum spikes contributions to reliablility (Talk@Staytreat)

Changing machine: stabilization (Bialas and/or Powers)

2. Why have we lost 15-25 MV/linac compared to commissioning period?

How answer question?

Cryomodule coupling experiments

More microphonic studies

Valve issues/vacuum trips beam related?

High gradient running experiments during downs.

Warm region cleanliness. Either process or remove and replace.

Check cleanliness of older C20 warm region.

3. FE/Particulate Meeting Report (Geng)

Follow on activity and future planning


4. Capture degradation rate?

Look at archiver data and compare?

Other ideas?

Action Items