Difference between revisions of "PITMinutes 03-28-2016"
From CASA Wiki
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
== Attendance == | == Attendance == | ||
− | R. Bachimanchi, S. Cooper, E. Daly | + | R. Bachimanchi, S. Cooper, E. Daly, M. Drury, A. Freyberger, C. Hovater, R. Geng, G. Krafft, C. Mounts, C. Reece, R. Rimmer, T. Plawski, T. Powers, S. Suhring |
== Agenda and Notes == | == Agenda and Notes == | ||
− | |||
− | |||
1. Operations Status and Summary | 1. Operations Status and Summary | ||
LERF Borrowing | LERF Borrowing | ||
+ | |||
+ | C50-12 is nominal solution yielding 11.7 GeV | ||
+ | |||
+ | No current plans for repurpose LERF modules | ||
OPS Staytreat | OPS Staytreat | ||
Line 18: | Line 20: | ||
3. C75 (Marhauser/Rimmer) | 3. C75 (Marhauser/Rimmer) | ||
− | 4. FE Meeting Report (Geng) | + | 4. FE/Particulate Meeting Report (Geng) |
Latest revision as of 14:41, 28 March 2016
Attendance
R. Bachimanchi, S. Cooper, E. Daly, M. Drury, A. Freyberger, C. Hovater, R. Geng, G. Krafft, C. Mounts, C. Reece, R. Rimmer, T. Plawski, T. Powers, S. Suhring
Agenda and Notes
1. Operations Status and Summary
LERF Borrowing
C50-12 is nominal solution yielding 11.7 GeV
No current plans for repurpose LERF modules
OPS Staytreat
2. Heat Measurement Results (Daly)
3. C75 (Marhauser/Rimmer)
4. FE/Particulate Meeting Report (Geng)