== Attendance ==
 
== Attendance ==
  
R. Bachimanchi, S. Cooper, E. Daly, K. Davis, A. Freyberger, A. Hutton, G. Krafft, F. Marhauser, C. Reece, T. Reilly
+
R. Bachimanchi, E. Daly, K. Davis, M. Drury, C. Hovater, R. Geng, A. Hutton, A. Kimber, L. King, G. Krafft, F. Marhauser, C. Mounts, C. Reece, T. Reilly, T. Powers, S. Suhring, H. Zhang
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==
Line 7: Line 7:
 
1. Operations Status and Summary
 
1. Operations Status and Summary
  
Operational at 12 GeV and traded trips for
+
Operations at 12 GeV.
repetitive down times.
+
  
Will analyze over the next few days.
+
Beam ops again 28th January.
 
+
Beam ops 28th January
+
  
 
Jan 18-28 can RF/cavities operate without beam.
 
Jan 18-28 can RF/cavities operate without beam.
Line 49: Line 46:
  
  
3. Particulate-Free UHV Meeting (Geng)
+
4. Particulate-Free UHV Meeting (Geng)
  
 
Schedule for February 29
 
Schedule for February 29
Line 62: Line 59:
  
 
== Action Items ==
 
== Action Items ==
 
Complete Project Charter Document; Project Leader (Freyberg, Rimmer, Krafft, Hutton)
 
  
 
Data mining for field emission (Geng)
 
Data mining for field emission (Geng)

Latest revision as of 16:15, 4 January 2016

Attendance

R. Bachimanchi, E. Daly, K. Davis, M. Drury, C. Hovater, R. Geng, A. Hutton, A. Kimber, L. King, G. Krafft, F. Marhauser, C. Mounts, C. Reece, T. Reilly, T. Powers, S. Suhring, H. Zhang

Agenda and Notes

1. Operations Status and Summary

Operations at 12 GeV.

Beam ops again 28th January.

Jan 18-28 can RF/cavities operate without beam. Turn on/off infrastructure see microphonic effect.

Daly will compose "He boiling" TP

C100 tests (determine best pressure "defined by highest operating gradient" to operate at)

destinguish/study SEL GDR trip differences (Rama)

2. Results of He Processing (Drury)

3. C75 Project Preliminary Design Review

Project Internal Review: Thursday January 21 (Morning) Responsibility for Program/Agenda?

Cavities (FM) HOM (FM) Cryomodule (ED) Hygiene Plan (GG) Rimmer/Krafft (Specifications) Prototype Data Summary (FM) RF Power (Hovater)

Committee C Reece (chair), Andrew, Cardman)

Goal: Preliminary design review


4. Particulate-Free UHV Meeting (Geng)

Schedule for February 29 Program? Rong-liu will put together an agenda beginning of next year



Action Items

Data mining for field emission (Geng)

C75 parameter table! (krafft, rimmer, marhauser)

Heat For Project Charter (freyberger)