== Attendance ==
 
== Attendance ==
  
R. Bachimanchi, S. Cooper, E. Daly, A. Freyberger, C. Hovater, R. Geng, G. Krafft, F. Marhauser, T. Plawski, T. Powers, C. Reece, T. Reilly, H. Wang
+
R. Bachimanchi, S. Cooper, E. Daly, K. Davis, A. Freyberger, A. Hutton, G. Krafft, F. Marhauser, C. Reece, T. Reilly
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==
Line 7: Line 7:
 
1. Operations Status and Summary
 
1. Operations Status and Summary
  
Got 12 GeV to Hall D. 10s of muA delivered to Hall A.
+
Operational at 12 GeV and traded trips for
Trip Rates OK, but long down times from whole module downs.
+
repetitive down times.
C100s(powers supplies).
+
  
8:20 pm saterday, All 10 Hz noise disappeared. Cooling power
+
Will analyze over the next few days.
fan. Now up to 110 MV. We'll look at this in more detail.
+
phase correlations among cav 5s in each cryomodule.
+
  
when not running machine, have no indication of problems
+
Beam ops 28th January
in environment. Install accelerometers as permanent monitor.
+
  
Tom agreed/volunteered to vibration monitorring independent seeing
+
Jan 18-28 can RF/cavities operate without beam.
it in the RF systems.
+
Turn on/off infrastructure see microphonic effect.
  
RF/SRF Round-the-clock during recent operations period.
+
Daly will compose "He boiling" TP
  
Energy jitters are still present on beam.
+
C100 tests (determine best pressure
 +
"defined by highest operating gradient"
 +
to operate at)
  
Both north and south now operating at lower pressure and temperature.
+
destinguish/study SEL GDR trip differences (Rama)
 
+
Max OPs should be looked at again for a few specific cavities.
+
  
 
2. C75 Project (Freyberger)
 
2. C75 Project (Freyberger)
  
Project Internal Review: Thursday January 21
+
Project Internal Review: Thursday January 21 (Morning)
 
Responsibility for Program/Agenda?
 
Responsibility for Program/Agenda?
 +
 +
Cavities (FM)
 +
HOM (FM)
 +
Cryomodule (ED)
 +
Hygiene Plan (GG)
 +
Rimmer/Krafft (Specifications)
 +
Prototype Data Summary (FM)
 +
RF Power (Hovater)
 +
 +
Committee
 +
C Reece (chair), Andrew, Cardman)
 +
 +
Goal: Preliminary design review
 +
 +
  
 
3. Particulate-Free UHV Meeting (Geng)
 
3. Particulate-Free UHV Meeting (Geng)
  
 
Schedule for February 29
 
Schedule for February 29
Program?
+
Program? Rong-liu will put together an agenda
 +
beginning of next year
  
  
Line 65: Line 77:
  
 
Heat For Project Charter (freyberger)
 
Heat For Project Charter (freyberger)
 +
 +
Kimber and Nelson to invite list (Krafft)

Latest revision as of 14:58, 21 December 2015

Attendance

R. Bachimanchi, S. Cooper, E. Daly, K. Davis, A. Freyberger, A. Hutton, G. Krafft, F. Marhauser, C. Reece, T. Reilly

Agenda and Notes

1. Operations Status and Summary

Operational at 12 GeV and traded trips for repetitive down times.

Will analyze over the next few days.

Beam ops 28th January

Jan 18-28 can RF/cavities operate without beam. Turn on/off infrastructure see microphonic effect.

Daly will compose "He boiling" TP

C100 tests (determine best pressure "defined by highest operating gradient" to operate at)

destinguish/study SEL GDR trip differences (Rama)

2. C75 Project (Freyberger)

Project Internal Review: Thursday January 21 (Morning) Responsibility for Program/Agenda?

Cavities (FM) HOM (FM) Cryomodule (ED) Hygiene Plan (GG) Rimmer/Krafft (Specifications) Prototype Data Summary (FM) RF Power (Hovater)

Committee C Reece (chair), Andrew, Cardman)

Goal: Preliminary design review


3. Particulate-Free UHV Meeting (Geng)

Schedule for February 29 Program? Rong-liu will put together an agenda beginning of next year


  • First Draft version is attached below, modeled on tables in the

Cornell ERL "Project Definition Design Report". It contains input from Rimmer, Hutton, and Krafft but needs work on the cryomodule side. Daly and Mounts to help complete. Arne to derive cooling power requirement for charter document. Arne suggested publishing in tech note in about 6 weeks. Krafft will shepherd.

4. CEBAF Beamline Vacuum (Geng)

Action Items

Complete Project Charter Document; Project Leader (Freyberg, Rimmer, Krafft, Hutton)

Data mining for field emission (Geng)

C75 parameter table! (krafft, rimmer, marhauser)

Heat For Project Charter (freyberger)

Kimber and Nelson to invite list (Krafft)