Difference between revisions of "PITMinutes 01-10-2020"

From CASA Wiki
Jump to: navigation, search
(Agenda and Notes)
(Agenda and Notes)
Line 25: Line 25:
  
  
3. Particle Counter Update (Geng)
+
3. Trip Rates Update (Geng)
  
[https://casa.jlab.org/LINACPIT/Report_20191114145643.docx Particulates in Viton]
+
[https://casa.jlab.org/LINACPIT/PlotThreshVacTripSRF_v2.pdf Trip Rates Update]

Revision as of 08:42, 10 January 2020

Attendance

K. Baggett, M. Bickley, M. Drury, C. Hovater, R. Geng, C. Ginsburg, A. Hutton, A. Kimber, G. Krafft, F. Marhauser, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, R. Rimmer, and A. Solopova

Agenda and Notes

1. Operations Status and Summary/Review (Bickley)

Restart is proceding/

2. Warm Region Vacuum Specifications (Preble)

CEBAF Vacuum: "Cold" Vacuum System and Interlocks Interlocks

Linac Vacuum Section: CEBAF Design Handbook

CEBAF Vacuum System and Interlocks for Original 4 GeV Accelerator

Beam Pipe and Waveguide Vacuum Interlocks (Author: K. Jordan)

WBS1 VACUUM CONTROL SYSTEM (Author: K. Jordan)

CEBAF C100 Style Vacuum Interlocks


3. Trip Rates Update (Geng)

Trip Rates Update