Difference between revisions of "PITMinutes 10-07-2019"
(→Agenda and Notes) |
(→Attendance) |
||
Line 1: | Line 1: | ||
== Attendance == | == Attendance == | ||
− | R. Bachimanchi, K. Baggett, J. Benesch, E. Daly, M. Drury, C. Hovater, R. Geng, C. Ginsburg, G. Krafft, F. Marhauser, C. Mounts, T. Plawski, T. Powers, C. Reece, R. Rimmer, | + | R. Bachimanchi, K. Baggett, J. Benesch, E. Daly, M. Drury, C. Hovater, R. Geng, C. Ginsburg, G. Krafft, F. Marhauser, C. Mounts, T. Plawski, T. Powers, C. Reece, R. Rimmer, A. Solopova, and . |
== Agenda and Notes == | == Agenda and Notes == |
Revision as of 12:33, 7 October 2019
Attendance
R. Bachimanchi, K. Baggett, J. Benesch, E. Daly, M. Drury, C. Hovater, R. Geng, C. Ginsburg, G. Krafft, F. Marhauser, C. Mounts, T. Plawski, T. Powers, C. Reece, R. Rimmer, A. Solopova, and .
Agenda and Notes
1. Extended PIT Meeting (Resumption of Operations)
1:00 Goal for Meeting (Ginsburg)
1:10 Experiment Requirements and Desires for next running periods (HALL APLs, Grames)
Hall C Run Requirements (Benesch)
1:25 Performance Expectations in Relocated Modules (Drury)
Expected Performance After CM Swaps (Drury)
1:50 RF Configuration after SAD (Hovater)
1:55 Gradient Choice at Turnon (Benesch)
Fall Polarization Options (Benesch)
Fall Turnon Gradient Choice (Benesch)
2:05 Present Gradient Limitations (Drury)
Data from Commissioning (Drury)
2:25 Gradient Change Instructions for OPS (Solopova)
Gradient Change Instruction for OPS (Solopova)
2:40 Energy Reach (Baggett)
2:50 CEBAF Performance Plan (Michaud)