Difference between revisions of "PITMinutes 10-07-2019"
(→Agenda and Notes) |
(→Agenda and Notes) |
||
Line 20: | Line 20: | ||
1:45 Performance Expectations in Relocated Modules (Drury) | 1:45 Performance Expectations in Relocated Modules (Drury) | ||
+ | |||
+ | [https://casa.jlab.org/LINACPIT/Expected_Performance_after_CM_swaps.pptx Expected Performance After CM Swaps (Drury)] | ||
1:55 Gradient Choice at Turnon (Benesch) | 1:55 Gradient Choice at Turnon (Benesch) |
Revision as of 10:08, 7 October 2019
Attendance
R. Bachimanchi, K. Baggett, J. Benesch, E. Daly, M. Drury, C. Hovater, R. Geng, C. Ginsburg, G. Krafft, F. Marhauser, C. Mounts, T. Plawski, T. Powers, C. Reece, A. Rimmer, and A. Seryi.
Agenda and Notes
1. Extended PIT Meeting (Resumption of Operations)
1:00 Goal for Meeting (Ginsburg)
1:10 Experiment Requirements and Desires for next running periods (HALL APLs, Grames)
Hall C Run Requirements (Benesch)
1:25 SRF Configuration after SAD (Reilly)
1:35 RF Configuration after SAD (Hovater)
1:45 Performance Expectations in Relocated Modules (Drury)
Expected Performance After CM Swaps (Drury)
1:55 Gradient Choice at Turnon (Benesch)
Fall Polarization Options (Benesch)
Fall Turnon Gradient Choice (Benesch)
2:05 Present Gradient Limitations (Drury)
2:25 Gradient Change Instructions for OPS (Solopova)
Gradient Change Instruction for OPS (Benesch)
2:40 Energy Reach (Baggett)
2:50 CEBAF Performance Plan (Michaud)