Difference between revisions of "PITMinutes 08-26-2019"

From CASA Wiki
Jump to: navigation, search
(Agenda and Notes)
(Agenda and Notes)
Line 17: Line 17:
 
2 LERF Q_0 Measurements and implications for CEBAF (Daly)
 
2 LERF Q_0 Measurements and implications for CEBAF (Daly)
  
[https://casa.jlab.org/LINACPIT/LERF_CEBAF_Qo_Meassurements.pptx Presentation on LERF Q_0 Measurement]
+
[https://casa.jlab.org/LINACPIT/LERF_CEBAF_Qo_Measurements.pptx Presentation on LERF Q_0 Measurement]
  
 
3. Some Comments on particulates (Geng)
 
3. Some Comments on particulates (Geng)

Revision as of 13:25, 26 August 2019

Attendance

K. Baggett, C. Hovater, R. Geng, A. Hutton, G. Krafft, A. Kimber, K. Macha, C. Mounts, R. Nelson, T. Plawski, T. Powers, R. Rimmer, C. Reece, A. Seryi, and H. Wang.

Agenda and Notes

1. Operations Status and Summary/Review (Bickley)

Physics run extended and two weeks added to shutdown. Good reliability running at low energy. Re-planned summer maintenance work. Full E' plan will be executed. Low energy setup with reduced heating accomplished.

Plan for module swaps complete.

2 LERF Q_0 Measurements and implications for CEBAF (Daly)

Presentation on LERF Q_0 Measurement

3. Some Comments on particulates (Geng)

Many valve closure tests completed and log entries made. Particulates ranging in size from sub-micron to several microns are observed in the tests.

3. In Situ Q_L Measurements Update (Marhauser)

Presentation on Q_L Measurement