Difference between revisions of "PITMinutes 05-06-2019"
From CASA Wiki
(Created page with "== Attendance == R. Bachimanchi, K. Baggett, M. Bickley, K. Davis, R. Geng, C. Hovater, G. Krafft, A. Kimber, R. Nelson, T. Plawski, T. Powers, and H. Wang. == Agenda and No...") |
(→Agenda and Notes) |
||
Line 18: | Line 18: | ||
− | [https://casa.jlab.org/LINACPIT/ | + | [https://casa.jlab.org/LINACPIT/LLRF_X_2_transmitter_performance.pptx LLRF Transmitter] |
Revision as of 13:30, 6 May 2019
Attendance
R. Bachimanchi, K. Baggett, M. Bickley, K. Davis, R. Geng, C. Hovater, G. Krafft, A. Kimber, R. Nelson, T. Plawski, T. Powers, and H. Wang.
Agenda and Notes
1. Operations Status and Summary/Review (Freyberger)
Continued quiet running at reduced energy. 85% availability at low energy.
2. RF Fault analysis (Plawski)
Many indicated quench faults are not real quenches because the field energy leaves the cavities too quickly. Some preliminary investigations
3. Cryomnodule Modifications (Marhauser)
Spread sheet for performance prediction has been created. Many different scenarios may now be investigated.
Energy Reach Calculator/Predictor
Action Items
Leadership of quenches. Offline discussion.
C100 Refurbishment Project for the future?