Difference between revisions of "JLEIC-pCDR"

From CASA Wiki
Jump to: navigation, search
Line 19: Line 19:
  
 
* '''By Nov 10 2017:''' Confirm all potential section/subsection contributors
 
* '''By Nov 10 2017:''' Confirm all potential section/subsection contributors
 +
 +
== Errata (reverse time order) ==
 +
* '''Oct 25 2017:''' Yuhong noted that the ion collider section should include some details on transition crossing. Todd will coordinate with Vasiliy. Note that proton injection may be sufficiently close to existing collider ring gammaT to warrant some concern.

Revision as of 12:52, 25 October 2017

JLEIC pre-Conceptual Design Document

References

  • TDR outline (pdf)
    • Last updated Wed Oct 25
    • Includes many suggested writing assignments
  • Above documents and source managed on Dropbox; contact Todd for an invitation

Outstanding items

  • By Oct 31 2017: Collect initial draft machine tables/reference documents
    • Requested at Sep 22 and Oct 6 integration meetings.
    • Collect in DocDB and update versions as needed throughout pCDR process.
  • By Nov 3 2017: Identify all potential section/subsection contributors
  • By Nov 10 2017: Confirm all potential section/subsection contributors

Errata (reverse time order)

  • Oct 25 2017: Yuhong noted that the ion collider section should include some details on transition crossing. Todd will coordinate with Vasiliy. Note that proton injection may be sufficiently close to existing collider ring gammaT to warrant some concern.