Difference between revisions of "PERLE Meetings"

From CASA Wiki
Jump to: navigation, search
(Collaboration meetings)
(Collaboration meetings)
 
(27 intermediate revisions by the same user not shown)
Line 9: Line 9:
 
Place: JLAB ARC 728 (call-in information below)
 
Place: JLAB ARC 728 (call-in information below)
  
 +
============================================================
  
 
AGENDA
 
AGENDA
  
     <UL><li>[http://casa.jlab.org/PERLE/PERLE_Optics_Orsay_2a.ppt Current accelerator design – Overview]    - Alex Bogacz </ul>
+
     <UL><li>[http://casa.jlab.org/PERLE/PERLE_Optics_Orsay_2a.ppt Current accelerator design – Overview]    - Alex </UL>
     <UL><li>[Preliminary magnet inventory & specs – Discussion]   - All </ul>
+
     <UL><li> Preliminary magnet inventory, lattice depository – Discussion    - All </UL>
     <li>Preliminary magnet inventory & specs – Discussion        All
+
     <UL><li> PERLE@Orsay '10+2 pages summary'    - Max and Walid </UL>
Preliminary magnet inventory & specs – Discussion        All
+
  1.  Introduction  - Max  (0.5p)  [W]
    Steps towards the TDR – Discussion:                      All
+
  2.  Lattice and Optics - Alex (2p)  [M]
 +
  3.  Infrastructure at Orsay, including remarks on beam extraction/experiments - Walid (1p)  [M]
 +
  4.  Gun and Injector - Boris/Deepa (1p) [M/W]
 +
  5.  Cavity - Bob (1p)  [M]
 +
  6.  Cryomodule - Sebastien (1p) [W]
 +
  7.  Magnets - Attilio (1p) [M]
 +
  8.  Dump - Oliver (from CDR) (0.5p) [M]
 +
  9.  Power and Cryogenics Equipment - Erk (1p) [W]
 +
  10. Monitoring Equipment - Walid (1p)  [M]
 +
  --------------------------------------------------
 +
  Appendix (2p) Configuration and Cost - Achille [M]
 +
  Table of Components with Basic parameters, numbers, cost and delivery
 +
  status  (input for that comes from the individual contributions, we
 +
  shall know the nominal cost and the real cost, which is smaller due to
 +
  in kind contributions)
 +
  <UL><li> Steps towards the TDR – Discussion   - All </UL>
 
         Liner lattice optimization
 
         Liner lattice optimization
 
         Initial magnet specs
 
         Initial magnet specs
Line 33: Line 49:
 
============================================================
 
============================================================
  
<UL>
+
<UL> <li>Information for connecting through BlueJeans <UL>
<li>Working Group/Collaboration Progress Update
+
            To join or start the meeting, go to:
<ul>
+
            <UL>https://bluejeans.com/481508338?g=nvxxe332n53ea2tmmfrc433sm4======</UL>
<li>Todd Satogata [http://casa.jlab.org/MEIC%20meeting/20170420/2017-04-20-JleicRD-IonIntegration.pptx Ion Injector Complex/Parameter Development]</li>
+
 
<li>Brahim Mustapha (ANL) [http://casa.jlab.org/MEIC%20meeting/20170420/JLEIC-Linac-Progress-Summary_042017.pptx Ion Linac]</li>
+
Connecting directly from a room system? </UL>
<li>Fanglei Lin/Vasiliy Morozov [http://casa.jlab.org/MEIC%20meeting/20170420/2017Apr20_JLEIC_ePol.pptx Electron Polarization] [http://casa.jlab.org/MEIC%20meeting/20170420/Morozov_ion_pol_update_20apr17.pptx Ion Polarization]</li>
+
        <UL>1) Dial: 199.48.152.152 or bjn.vc </UL>
</ul>
+
        <UL>2) Enter Meeting ID: 481508338 -or- use the pairing code </UL>
 +
 
 +
        <UL>Just want to dial in? (http://bluejeans.com/numbers) </UL>
 +
        <UL>1) +1 408 740 7256 </UL>
 +
        <UL>+1 888 240 2560 (US Toll Free) </UL>
 +
        <UL>+1 408 317 9253 (Alternate Number) </UL>
 +
        <UL>2) Enter Meeting ID: 481508338 </UL>

Latest revision as of 15:57, 25 May 2017

Collaboration meetings

2017-5-26

Date: Friday, May 26, 2017

Time: 10:00 - 11:00 AM (EST) 4:00 - 5:00 PM (GMT+2 DST)

Place: JLAB ARC 728 (call-in information below)

================================================

AGENDA

  • Preliminary magnet inventory, lattice depository – Discussion - All
  • PERLE@Orsay '10+2 pages summary' - Max and Walid
 1.  Introduction   - Max  (0.5p)  [W]
 2.  Lattice and Optics - Alex (2p)  [M]
 3.  Infrastructure at Orsay, including remarks on beam extraction/experiments - Walid (1p)  [M]
 4.  Gun and Injector - Boris/Deepa (1p) [M/W]
 5.  Cavity - Bob (1p)  [M]
 6.  Cryomodule - Sebastien (1p) [W]
 7.  Magnets - Attilio (1p) [M]
 8.  Dump - Oliver (from CDR) (0.5p) [M]
 9.  Power and Cryogenics Equipment - Erk (1p) [W]
 10. Monitoring Equipment - Walid (1p)  [M]
 --------------------------------------------------
 Appendix (2p) Configuration and Cost - Achille [M]
 Table of Components with Basic parameters, numbers, cost and delivery
 status  (input for that comes from the individual contributions, we
 shall know the nominal cost and the real cost, which is smaller due to
 in kind contributions)
  • Steps towards the TDR – Discussion - All
       Liner lattice optimization
       Initial magnet specs
       Momentum acceptance and longitudinal match
       End-to-End simulation with synchrotron radiation, CSR micro-bunching (ELEGANT?)
       Correction of nonlinear aberrations (geometric & chromatic) with multipole magnets (sext. octu.?)
       RF cavity design, HOM content
       BBU studies (TDBBU?)
       Injection line/chicane design
       Space-charge studies at injection
       Diagnostics & Instrumentation
       Multi-particle tracking studies of halo formation
       Final magnet specs 
       Engineering design 
================================================