Line 7: Line 7:
 
1. Operations Status and Summary
 
1. Operations Status and Summary
  
Recovery Plans. Still Diagnosing Cryo problems.
+
Recovery Plans. Still diagnosing/checking Cryo issues.
 
Definite sensor wire connection failure. Only 4 K
 
Definite sensor wire connection failure. Only 4 K
work over the summer. Probably no 2 K ops until late summer.
+
work over the summer; probably no 2 K ops until late summer.
 +
Still need to open up cold box and look to make sure no damage.
 +
Cryo Review first week June to help on cryo operations turnon.
  
Gradient Achievement and maintenance plans being
+
Twenty years plan for meeting performance and maintaining
developed. Need 6-8 New C75 modules over 5 years.
+
12 GeV performance. Gradient Achievement and maintenance plans being
 +
developed. Need 8 New C75 modules over 5 years. 37 weeks/yr goal.
 +
Obsolescence plan will also be included (old analogue to digital)
 +
Presentation in two weeks. Potential new cold box in plan
 +
(calling infrastructure might make funding easier).
 +
 
 +
4 K running might be OK for addressing operability issues.
 +
More extensive running may be in the offing.
  
  
 
2. "Staytreat" Discussion
 
2. "Staytreat" Discussion
 +
 
Preliminary topics list have been uploaded.
 
Preliminary topics list have been uploaded.
 
Meeting has been drifting back towards end of
 
Meeting has been drifting back towards end of
Line 24: Line 34:
  
 
Gradients of two reworked "C57" cavities are topping
 
Gradients of two reworked "C57" cavities are topping
out in mid-teens of cavity gradient. Full upgrades of
+
out in mid-teens of cavity gradient.
 +
 
 +
Full upgrades of
 
LLRF and klystrons not needed (still probably like hot
 
LLRF and klystrons not needed (still probably like hot
klystrons on these cavities.
+
klystrons on these cavities).
 +
 
 +
Presentation next week.
  
  
 
4. Backing Pump Discussion
 
4. Backing Pump Discussion
  
Additional data mining performed. Consult with
+
Additional data mining performed.
Benesch and . Gigi marcy looked at geome34try and
+
suggested ,.  Capacitor pumps on order anyway. Go
+
through and sellect a promising module for test.
+
4 weeks plan will be presented.
+
Next Steps
+
  
[https://casa.jlab.org/LINACPIT/WGBackingPump.pdf Waveguide Backing Pump Discussion]
+
Gigi and Marcy looked at geometry and
 +
suggested pump reorientation.
 +
 
 +
[https://casa.jlab.org/LINACPIT/C50_WGVac_Trips_Pt2.pptx Waveguide Backing Pump Discussion]
  
  
Line 57: Line 69:
  
 
== Action Items ==
 
== Action Items ==
 +
 +
Leadership of quenches. Offline discussion.

Latest revision as of 09:56, 22 May 2017

Attendance

R. Bachimanchi, K. Baggett, E. Daly, A. Freyberger, C. Hovater, A. Hutton, G. Krafft, A. Kimber, R. Legg, M. McCaughan. F. Marhauser, R. Nelson, T. Powers, T. Plawski, T. Reilly, R. Rimmer, and S. Suhring

Agenda and Notes

1. Operations Status and Summary

Recovery Plans. Still diagnosing/checking Cryo issues. Definite sensor wire connection failure. Only 4 K work over the summer; probably no 2 K ops until late summer. Still need to open up cold box and look to make sure no damage. Cryo Review first week June to help on cryo operations turnon.

Twenty years plan for meeting performance and maintaining 12 GeV performance. Gradient Achievement and maintenance plans being developed. Need 8 New C75 modules over 5 years. 37 weeks/yr goal. Obsolescence plan will also be included (old analogue to digital) Presentation in two weeks. Potential new cold box in plan (calling infrastructure might make funding easier).

4 K running might be OK for addressing operability issues. More extensive running may be in the offing.


2. "Staytreat" Discussion

Preliminary topics list have been uploaded. Meeting has been drifting back towards end of summer. Now August 2-3.


3. Performance of C57

Gradients of two reworked "C57" cavities are topping out in mid-teens of cavity gradient.

Full upgrades of LLRF and klystrons not needed (still probably like hot klystrons on these cavities).

Presentation next week.


4. Backing Pump Discussion

Additional data mining performed.

Gigi and Marcy looked at geometry and suggested pump reorientation.

Waveguide Backing Pump Discussion


5. Lead Collars (Legg)

Lead Collars for C100s


Radiation shielding at end of C100s has been explored by Legg. preliminary design has been completed. goal to help save girders.

New module will be C57. More planning for the 2018 Module needed.

4. Particulates reporting; SRF in Dirty Machine Workshop: HZB. Josh, Tom, and Thomas in two weeks.

Girder Particulate Summary

Action Items

Leadership of quenches. Offline discussion.