Definite sensor wire connection failure. Only 4 K
 
Definite sensor wire connection failure. Only 4 K
 
work over the summer. Probably no 2 K ops until late summer.
 
work over the summer. Probably no 2 K ops until late summer.
 +
Still need to open up and look to make sure no damage.
 +
Cryo Review first week June to help on turnon operations
 +
again.
 +
 +
Twenty years plan for meeting performance and maintaining
 +
12 GeV performance. Gradient Achievement and maintenance plans being
 +
developed. Need 8 New C75 modules over 5 years. 37 weeks/yr goal.
 +
Obselescence plan will also be included (old analogue to digital)
 +
Presentation is two weeks. Potential new cold box in plan
 +
(calling infrastructure might make funding easier)
 +
 +
4 K running might be OK for addre3ssing operability issues.
 +
More extensive running may be in the offing.
  
Gradient Achievement and maintenance plans being
 
developed. Need 6-8 New C75 modules over 5 years.
 
  
  
Line 26: Line 37:
 
out in mid-teens of cavity gradient. Full upgrades of
 
out in mid-teens of cavity gradient. Full upgrades of
 
LLRF and klystrons not needed (still probably like hot
 
LLRF and klystrons not needed (still probably like hot
klystrons on these cavities.)
+
klystrons on these cavities.) Presentation next week.
  
  
Line 57: Line 68:
  
 
== Action Items ==
 
== Action Items ==
 +
 +
Leadership of quenches. Offline discussion.

Revision as of 14:08, 8 May 2017

Attendance

R. Bachimanchi, K. Baggett, E. Daly, A. Freyberger, C. Hovater, A. Hutton, G. Krafft, A. Kimber, R. Legg, M. McCaughan. F. Marhauser, R. Nelson, T. Powers, T. Plawski, T. Reilly, R. Rimmer, and S. Suhring

Agenda and Notes

1. Operations Status and Summary

Recovery Plans. Still Diagnosing Cryo problems. Definite sensor wire connection failure. Only 4 K work over the summer. Probably no 2 K ops until late summer. Still need to open up and look to make sure no damage. Cryo Review first week June to help on turnon operations again.

Twenty years plan for meeting performance and maintaining 12 GeV performance. Gradient Achievement and maintenance plans being developed. Need 8 New C75 modules over 5 years. 37 weeks/yr goal. Obselescence plan will also be included (old analogue to digital) Presentation is two weeks. Potential new cold box in plan (calling infrastructure might make funding easier)

4 K running might be OK for addre3ssing operability issues. More extensive running may be in the offing.


2. "Staytreat" Discussion Preliminary topics list have been uploaded. Meeting has been drifting back towards end of summer. Now August 2-3.


3. Performance of C57

Gradients of two reworked "C57" cavities are topping out in mid-teens of cavity gradient. Full upgrades of LLRF and klystrons not needed (still probably like hot klystrons on these cavities.) Presentation next week.


4. Backing Pump Discussion

Additional data mining performed. Consult with Benesch and . Gigi marcy looked at geome34try and suggested ,. Capacitor pumps on order anyway. Go through and sellect a promising module for test. 4 weeks plan will be presented. Next Steps

Waveguide Backing Pump Discussion


5. Lead Collars (Legg)

Lead Collars for C100s


Radiation shielding at end of C100s has been explored by Legg. preliminary design has been completed. goal to help save girders.

New module will be C57. More planning for the 2018 Module needed.

4. Particulates reporting; SRF in Dirty Machine Workshop: HZB. Josh, Tom, and Thomas in two weeks.

Girder Particulate Summary

Action Items

Leadership of quenches. Offline discussion.