Difference between revisions of "PITMinutes 03-13-2017"

From CASA Wiki
Jump to: navigation, search
(Agenda and Notes)
 
Line 25: Line 25:
  
  
4. C57 (Reilly and Marhauser)
+
4. Reduction of WG Faults (Ciovati)
  
Two cavities meet the spec and will be put in new cryomodule.
 
Series 001 and 003 look OK, 14.5 MV.
 
Specs in Pansophy.
 
Current plan C57 goes into weakest slot, probably in NLINAC.
 
Qext came out a little off but tuned to nominal 2-3 e7.
 
  
Make sure the two "57" cavities have the best klystrons possible.
+
.
  
  

Latest revision as of 13:30, 13 March 2017

Attendance

R. Bachimanchi, K. Baggett, A. Freyberger, R. Geng, C. Hovater, A. Hutton, G. Krafft, A. Kimber, F. Marhauser, C. Mounts, R. Nelson, T. Plawski, and T. Reilly

Agenda and Notes

1. Operations Status and Summary

Down Hard! Opportunity for trip reduction studies in N Linac.


2. Microphonics Planning (Powers)

Status Microphonics Planning Presentation


3. C50-13 Field Emission Data (Geng)

Status Presentation

Arne's Energy Reach Summary Document

Problems in the newly installed cryomodule. Stimulated tuner discussion. Bad matching between drive and stepper motors. Meeting Friday scheduled to try to get closure.


4. Reduction of WG Faults (Ciovati)


.


5. Regular reporting; Josh, Tom, and Thomas in two weeks.

Girder Particulate Summary

Action Items